Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums |

130703 0161365 viewsMurdinga, overview of the station yard looking north, siding point lever and indicator, Mallee style shelter train control building in the far distance on the left beside train, grain train loading on the siding, eight cell concrete grain silo complex with Ascom single cell behind it. Geo location. 3rd July 2013.
|
|

130703 0278365 viewsKaldow, HAN type bogie grain hopper waggon HAN 47, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130704 0419365 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, seen here backing up to re-join the rest of the train on the mainline with one of only three electric signals on the network, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
|
|

130704 0453365 viewsKyancutta, HAN type bogie grain hopper waggon HAN 46, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130704 0456365 viewsKyancutta, HAN type bogie grain hopper waggon HAN 17, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130704 0493365 viewsMoule, yard view looking east from the points for the single ended ballast siding with ballast pile of the left. Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.
|
|

130705 0558365 viewsLock, HCN type bogie grain hopper waggon HCN 9, originally an NHB type hopper NHB 1024 built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Fitted with a Moose Metalworks roll-top cover. 5th July 2013.
|
|

130705 0622365 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0646365 viewsLock, HAN type bogie grain hopper waggon HAN 59, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130706 0680365 viewsPort Lincoln, looking at the port infrastructure and the grain loading system.
|
|

130708 0785365 viewsCharra, Charoban Rd grade crossing, 477.8 km.
|
|

130708 0887365 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 54 S, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

130708 0908365 viewsThevenard originally an Kinki Sharyo built NHA type NHA 1000 for the NAR now coded ENHA type ENHA 6, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

060110 2206365 viewsYeelanna, ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 shunts back onto its train of empties on the mainline as the second person prepares to re-join the train, a rake of waggons in grain siding await loading. Approx. location of image.
|
|

161109 1974365 viewsThevenard, train 4DD4 rumbles across Bergmann Drive as third unit Genesee & Wyoming locomotive AE Goodwin ALCo model DL531 unit 859 'City of Port Lincoln' serial 84705, built in 1963, 859 started life at Peterborough, spent some years in Tasmania and even spent time in Perth on standard gauge before being transferred to the Eyre Peninsula system in 2003.
|
|

060113 2551364 viewsKevin, standing on the mainline to Thevenard, and the train now identified as 6DD4 has commenced loading of gypsum but the 988 Cat front end loaders which takes about one and half hours to load. As the train reversed on the triangle the consist is the same heading back loaded with 1604 leading NJ 3 and 1601. 13th January 2006.
|
|

130703 0194364 viewsTooligie, HAN type bogie grain hopper waggon HAN 35, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system. 3rd July 2013.
|
|

130703 0257364 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|

130703 0259364 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|

130703 0275364 viewsKaldow, HCN type bogie grain hopper waggon HCN 4, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|
| 2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
95 |  |
 |
 |
 |
 |
 |
 |
|