Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums

Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums
161109_1926.jpg
161109 1926407 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 29 with hungry boards loaded with gypsum.
030404_082825.jpg
030404 082825407 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's Goninan built GE Cv40-9i model NR class units NR 30 serial 7250-06 / 97-236 and a sister unit. 4th April 2003.
030411_110227.jpg
030411 110227406 viewsKimba, rail recovery winch waggon EZWL 2, shows cabin mounted above motor and winch, built using underframe of broad gauge horse box BH 4331. To Eyre Peninsula 1992, recoded then from AZWL. Scrapped in 2005.
060111_2308.jpg
060111 2308406 viewsKopi, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
060111_2331.jpg
060111 2331406 viewsWarramboo, located at the 190.2 km and opened with the line in May 1913, with now disused station building on the left, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 stands on the mainline as loading on the grain siding has started. 11th January 2006.
060113_2527.jpg
060113 2527406 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.
060113_2571.jpg
060113 2571406 viewsThevenard, a view of the conveyors and unloading shed of Gypsum Resources Australia (GRA) plant as train 6DD4 commences unloading. 13th January 2006.
130703_0280.jpg
130703 0280406 viewsKaldow, HCN type bogie grain hopper waggon HCN 29, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
130703_0291.jpg
130703 0291406 viewsKaldow, HAN type bogie grain hopper waggon HAN 9, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130703_0295.jpg
130703 0295406 viewsKaldow, HCN type bogie grain hopper waggon HCN 26, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
130703_0299.jpg
130703 0299406 viewsKaldow, HAN type bogie grain hopper waggon HAN 2, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130704_0429.jpg
130704 0429406 viewsKyancutta, 1200 class unit 1204 wearing current owner Genesee & Wyoming livery is a Clyde Engineering built EMD G12C model with serial 65-428 was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1514 recoded to 1204 in April 2004 and to the Eyre Peninsula in July 2004.
130704_0485.jpg
130704 0485406 viewsKyancutta, the rear of a south bound loaded grain as it departs with the final four waggons all HCN type bogie grain hoppers converted by SAR Islington Workshops from Tulloch Ltd NSW built NHB type hopper waggons. 4th July 2013.
130704_0498.jpg
130704 0498406 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.
130705_0536.jpg
130705 0536406 viewsLock, side view of Genesee & Wyoming 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
130705_0544.jpg
130705 0544406 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0554.jpg
130705 0554406 viewsLock, HAN type bogie grain hopper waggon HAN 60, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system. 5th July 2013.
130705_0555.jpg
130705 0555406 viewsLock, HBN type dual use ballast / grain hopper waggons, HBN 10 still with side gangways in place. One of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000. 5th July 2013.
130705_0580.jpg
130705 0580406 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.
130706_0680.jpg
130706 0680406 viewsPort Lincoln, looking at the port infrastructure and the grain loading system.
2177 files on 109 page(s) 89

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional