Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums |

060113 2489432 viewsKevin, the triple NJ-1600 class combination of 1604, NJ 3 and 1601 pull the empty gypsum train 6DD3 along the Penong line prior to reversing around the triangle. 13th January 2006.
|
|

060113 2510432 viewsKevin, empty train 6DD3 shunts back onto the triangle leg behind triple NJ/1600 class units, Clyde Engineering built EMD JL22C models, originally coded the NJ class and built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981 and recoded to the 1600 class. 13th January 2006.
|
|

060113 2584432 viewsCeduna, or Denial Bay area, empty gypsum train 6DD5 blasts up hill at the 440 km, west of Carpenter Corner Rd with power from triple 1600/NJ class units 1604, NJ 3 and 1601. 1604 in Australian Railroad Group livery is a Clyde Engineering built EMD JL22C model serial 71-731, originally built as NJ class NJ 4. Location approximation. 13th January 2006.
|
|

130704 0480432 viewsKyancutta, HCN type bogie grain hopper waggon HCN 21, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

130705 0644432 viewsLock, HAN type bogie grain hopper waggon HAN 12, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130708 0808432 viewsMoule, Mewett Rd grade crossing, 470.1 km.
|
|

130708 0851432 viewsPenong Junction, [url=https://goo.gl/maps/45FyW]429.7 km[url].
|
|

130708 0853432 viewsPenong Junction, [url=https://goo.gl/maps/45FyW]429.7 km[url].
|
|

030403 162352432 viewsCrystal Brook, view from rear of CLF class leader CLF 1 'City of Whyalla' serial 93-AN-1, rebuilt by MKA to EMD model AT26C-2M from CL class unit CL 2 in 1993. 3rd April 2003.
|
|

030406 100824431 viewsCummins, expanded view of the grain bunker rail unloading facility with dual DOH 'Drive Over Hopper' and stackers for loading road vehicles and with the overhead outflow bin and feed conveyors for loading rail waggons. 6th April 2003.
|
|

060108 2076431 viewsLock, ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, final of fourteen originally built between 1960-65 for WAGR as their A class A 1514, fitted with dynamic brakes and financed by Western Mining Corporation, started on the Eyre Peninsula in August 2004. Shows dynamic brake grid arrangement and cab air conditioner unit.
|
|

060109 2140431 viewsWannamana, on the curve 2 km north of the former station site empty train lead by ASR 830 class unit 842, an AE Goodwin built ALCo DL531 model loco serial 84140 with an EMD 1200 class and a sister ALCo unit. 9th January 2006.
|
|

060111 2356431 viewsKyancutta, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.
|
|

060113 2495431 viewsKevin, originally one of sixty two Kinki Sharyo built NH type for the NAR in 1966, now coded ENH type ENH 6 and with new hungry boards fitted and access ladder still intact. Empty train 6DD3 on the stub of the now closed line to Penong.
|
|

060113 2497431 viewsKevin, empty train 6DD3 on the stub of the now closed line to Penong shunts back onto the triangle leg to reverse the train prior to loading. 13th January 2006.
|
|

060113 2506431 viewsKevin, empty train 6DD3 shunts back onto the triangle leg with the end of the goods siding visible on the right. 13th January 2006.
|
|

060113 2552431 viewsKevin, standing on the mainline to Thevenard, and the train now identified as 6DD4 has commenced loading of gypsum but the 988 Cat front end loaders which takes about one and half hours to load. As the train reversed on the triangle the consist is the same heading back loaded with 1604 leading NJ 3 and 1601. 13th January 2006.
|
|

130705 0512431 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
|
|

130706 0677431 viewsPort Lincoln, looking at the port silo storage facility from Bishop Street.
|
|

130708 0741431 viewsCharra, Charoban Rd grade crossing, 477.8 km.
|
|
| 2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
66 |  |
 |
 |
 |
 |
 |
 |
|