Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Western Australian Negative and Digital Albums

Most viewed - Western Australian Negative and Digital Albums
199-06.jpg
199-06547 viewsMeckering, National Rail NR class units NR 19 and NR 20 both being Goninan built GE Cv40-9i models head up train 7PM5 as they wait for a cross with the Prospector in the loop 1400 hrs 21st June 1997.
199-18.jpg
199-18547 viewsMeckering, National Rail NR class units NR 19 and NR 20 Goninan built GE Cv40-9i models lead train 7PM5 as they power out of the loop following a cross with the Prospector 1420 hrs 21st June 1997.
208-2-06.jpg
208-2-06547 viewsToodyay, emus at the Free Range Emu Farm.
060116_2677.jpg
060116 2677547 viewsWest Kalgoorlie, AOPY 32382 with black and white fleet number of 904, one of seventy ex ANR coal waggons rebuilt from AOKF type by Bluebird Engineering SA in service with ARG on Koolyanobbing iron ore trains. They used to be three metres longer and originally built by Metropolitan Cammell Britain as GB type in 1952-55, 16th January 2006.
060527_4077.jpg
060527 4077547 viewsLeonora, WN 523, pneumatic discharge nickel concentrate waggon, one of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
202-14.jpg
202-14546 viewsMeckering, view looing east at the catch points and dwarf indicator at the west end of the goods siding, grain bunker and silos with the goods shed and station visible in the distance.
060527_4075.jpg
060527 4075546 viewsLeonora, WN 510, pneumatic discharge nickel concentrate waggon, one of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
051101_6419.jpg
051101 6419546 viewsParkeston, AHLY 0022 one of sixty five AHBY type ballast hoppers built by EDI Rail at their Port Augusta Workshops for ARG in 2001-02 for the Darwin line construction, now in limestone quarry products service.
051101_6445.jpg
051101 6445546 viewsParkeston, WHA 31432 seen here in Loongana Limestone service, originally built by Goninan WA for Western Quarries as a batch of twenty coded WHA type in 1995. Purchased by Westrail in 1998.
208-2-21.jpg
208-2-21546 viewsMt Lawley, Westrail L class L 263 Clyde Engineering EMD model GT26C serial 68-553 leads the empty cars from the Indian Pacific to Forrestfield.
201-02.jpg
201-02545 viewsMidland, the first Perth built NR class NR 61 Goninan GE model Cv40-9i serial 7250-11/96-263 shunts at Midland with two brand new NR units and waggon RQRX type RQRX 60177.
209-00.jpg
209-00545 viewsEast Perth, narrow gauge Perth to Midland service arrives with an Goninan NSW built ADC class railcar ADC 860 leading an ADL class with the Indian Pacific to the right.
051101_6422.jpg
051101 6422545 viewsParkeston, AHBY 0051 one of sixty five AHBY type ballast hoppers built by EDI Rail at their Port Augusta Workshops for ARG in 2001-02 for the Darwin line, also the FMG construction in 2008, here in limestone quarry products service.
140601_4645.jpg
140601 4645545 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHCH type waggon CHCH 7739 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
202-11.jpg
202-11544 viewsMeckering, interlocking arrangement for the grain siding, west end points off the crossing loop.
202-19.jpg
202-19544 viewsMeckering, looking east with the grain siding joining the goods loop, then with the goods siding branching off to the left, goods shed and crane on the left, station just visible on the right.
208-2-03.jpg
208-2-03544 viewsToodyay, emus at the Free Range Emu Farm.
208-2-32.jpg
208-2-32543 viewsDimboola, the Up Dimboola pass lead by Victorian Railways liveried B class B 65, Clyde Engineering EMD model ML2 serial ML2-6 with D van and N set.
199-07.jpg
199-07542 viewsMeckering, National Rail NR class unit NR 19 Goninan built GE Cv40-9i model heads up train 7PM5 as it waits for a cross with the Prospector in the loop 1400 hrs 21st June 1997.
202-21.jpg
202-21542 viewsMeckering, view of the goods shed from the south east end, shows loading platform, ramps and crane.
4833 files on 242 page(s) 12

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional