Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
267-32.jpg
267-32391 viewsAt the 39 km, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands with the Sundowner Special alongside the AEI reader at the 39 km detector site on the Newman mainline. This was a special for the 25 years of the Alstom / BHP service agreement. Friday 12th of April 2002.
267-35.jpg
267-35391 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands on the Newman mainline with the train as the party alight for an inspection of the site. Friday 12th of April 2002.
269-18.jpg
269-18391 viewsBing North and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
226-37.jpg
226-37390 viewsShaw siding back track, 219 km, a defected waggon has been cut off a loaded Yandi train, waggon 1567 is a Comeng WA build from a batch of 288 built in 1974. GeoData.
230-05.jpg
230-05390 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
230-21.jpg
230-21390 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
234-09.jpg
234-09390 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of engine hood and fuel tank. Circa 1998.
040806_092730.jpg
040806 092730390 viewsGoldsworthy Junction, weighbridge test waggon 507, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon.
050801_4765.jpg
050801 4765390 viewsFlash Butt yard, rail recovery and transport train, builders plate of 1st lead off waggon 6011, built by Scotts of Ipswich Qld on 04-09-1970.
050522_2727.jpg
050522 2727390 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #17, 6016, built by Comeng WA in January 1971, also carries contract no. of 6506-016.
050724_4228.jpg
050724 4228390 viewsNelson Point yard, flat waggon #6? in service on the Pony re-laying train as a transport waggon for a gantry car as pictured. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
050724_4237.jpg
050724 4237390 viewsNelson Point yard, flat waggons in service on the Pony re-laying train as transport waggons for sleepers, with a gantry car delivering concrete sleepers to replace the removed steel sleepers. The left waggon is an ex Goldsworthy Mining flat waggon with a Scotts of Ipswich built flat waggon with the gantry car on it, built in 1970 for then Mt Newman Mining Company.
050625_3814.jpg
050625 3814390 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, two Barclay Mowlem sleeper inserter track machines off clear of the running lines. 25th June 2005.
050917_5515.jpg
050917 5515390 viewsCoon Siding, view of the tamper operators cabin location on Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
080621_2724.jpg
080621 2724390 viewsTabba South, view from rear of new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
080621_2731.jpg
080621 2731390 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, close up of bogie and detail of A end.
130720_1435.jpg
130720 1435390 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 715, modified from a similar CHQY class with the end framing removed attached to an SD40R unit 3091.
5944_001_Welshpool_1987April.jpg
5944 001 Welshpool 1987April390 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5453 serial G6012-2 built by AE Goodwin in 1969 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive. In this April 1987 view the process has started with the bogies and fuel tank removed. By February 1988 it would be the final C36-7M built for Mt Newman Mining as 5513. April 1987.
Jim Bisdee photo.
080124_1627.jpg
080124 1627390 viewsChapman Siding, new FMG ore waggon pair 1311 slave and 2312 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
080124_1631.jpg
080124 1631390 viewsChapman Siding, side view of control waggon 2314, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
6096 files on 305 page(s) 92

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional