Most viewed - Pilbara negative and digital Albums - Iron Ore |

239-14392 viewsOverview of the Yandi One Jaques J-Cone secondary crusher and scalping screen as viewed from above the middling crushers, looking down CV6. The conveyor from the right is CV3 from the primary crusher and reclaim tunnel. The bus in the background is parked at the offices and was usually driven by 'Tangles' the sampler. GeoData.
|
|

050518 2164392 viewsBing Siding. Side view of 1963 built Magor USA waggon 535, originally in ore service before conversion to a ballast waggon.
|
|

050518 2169392 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 533, originally in ore service before conversion to a ballast waggon.
|
|

050704 3987392 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
|
|

050409 0402392 viewsShell Swagman Roadhouse, side view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

050625 3602392 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
|
|

050801 4721392 viewsNelson Point yard, ballast regulator BR 33 a Plasser Australia model SSP 302 unit serial M486. 1st August 2005.
|
|

150620 9329392 viewsQuarry 8 ballast loading area, rake of CNR-QRRS of China built 99 tonne ballast waggons with the Difco USA built long and short side dump waggons with a Dash 8 loco on the rear.
|
|

170729 0135392 viewsGreen Pool, an empty Rio Tinto iron ore train runs along the Lyndon River behind General Electric built ES44DCi unit 8184 serial 60782 and a pair of Pilbara Iron liveried with HI reporting marks General Electric built Dash 9-44CW units 7045 and 7049. 29th July 2017. GeoData.
|
|

5952 001392 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
|
|

171018 0956392 viewsTad Yard, overview of Roy Hill's fuel tanks and waggon loading gantry with a fuel train being loaded headed up by ES44ACi unit RHA 1020 serial number 64301 built in Erie Pennsylvania, USA by GE. 17th October 2018.
|
|

080304 2209392 viewsThomas Yard, down the rail welding end, side view of slave waggon 1583, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

248-12392 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings powers away to the south with the signal marker boards are in the distance. Approximate location. 24th April 2004.
|
|

249-29392 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
|
|

268-12392 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

110620 1965r392 viewsWalla Siding, comparison between two BHP ore waggons loaded with Yandi fines of the Golynx design type, 8410 was built in November 2001 for bottom discharge on the Goldsworthy system with serial number 950088-340, while 6834 was built in 2008. The burn or weld marks are still visible on 8410 from when it was in GML service, now converted for rotary service, noticed the filled in end and the angle section along the top edge for support. 20th of June 2011.
|
|

221-36391 viewsYandi One mine loadout balloon loop, front on view of near new General Electric AC6000 unit 6074 serial 51066 as it loads a train.
|
|

226-17391 viewsShaw North, 216.5 km, departure signals SWN 4 for the mainline and SWN 6 for the loop for loaded trains that are about to descend the steep 1.5 percent decent to Garden Siding. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with solar array mounted above the cutting. The signal on the top of the cutting on the right is SWN 6R the repeater post for SWN 6 due to the 700 metre radius curve north bound trains approach this location. GeoData.
|
|

227-04391 viewsNelson Point, looking across with Anderson Point on the left and Stanley Point on the right, Boodarie workshop can be made out with a train in front of it. Today this view is very different!! GeoData.
|
|

227-25391 views30 km area, third unit on an empty ore train is class leader 6070 'Port Hedland' serial 51062 a General Electric AC6000 built by GE Erie. GeoData.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
90 |  |
 |
 |
 |
 |
 |
 |
|