Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
080116_1372.jpg
080116 1372393 viewsChapman Siding 69 km, FMG master or control waggon 2396 tare 22.9 tonnes with bar coupling for the 'married' pair showing the train pipe, waggon control pipe and electrical jumper. Built by China Southern or CSR at their the Zhuzhou Rolling Stock Works in China in 2007, stands on the passing track. 16th January 2008.
080124_1626.jpg
080124 1626393 viewsChapman Siding, new FMG ore waggon pair 1313 slave and 2314 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
200914_7774.jpg
200914 7774393 viewsPilbara Railways Historical Society, former ALCo built demonstrator locomotive model C-415 serial 3449-1 built April 1966, currently carrying number 1000, it was originally numbered 008 when Hamersley Iron purchased the unit in 1968. It was retired from service on the 24th February 1982. It then spent some time carrying number 2000 while building the Marandoo railway line from Sept 1991. 14th September 2020.
246-33.jpg
246-33393 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 925 a Centurion Industries WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
267-24.jpg
267-24393 viewsGoldsworthy Junction, CM40-8M GE rebuild unit 5653 'Chiba' serial number 8412-10 / 93-144 trails sister unit 5634 as 5634 turns on the power as it passes Goldsworthy Junction relay room and continues along the Newman Mainline with the Sundowner Special. Friday 12th of April 2002.
224-13.jpg
224-13392 viewsBing siding, the extent of the General Electric AC6000 radiators is evident in this back to back image of a pair of units.
224-36.jpg
224-36392 viewsBing siding, mid-train remote on the afternoon Yandi departure 6075 serial 51067 a General Electric AC6000 built by GE at Erie departs south. GeoData.
227-03.jpg
227-03392 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.
228-24.jpg
228-24392 viewsYandi Two branch, trailing shot of the afternoon empty train mid-train remotes heading west near the YT307 km in the form of elephant style Goninan final rebuild GE CM40-8MEFI model unit 5669 'Beilun' serial 8412-02/95-160 and CM40-8M model 5638 'Mallina' serial 8281-02/92-127. Geodata -22.706976, 119.097651 .
228-34.jpg
228-34392 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .
229-04.jpg
229-04392 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with second unit 5642 'Wallareenya' serial 8281-07 / 92-131 trailing sister unit 5650. GeoData.
230-03.jpg
230-03392 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
230-36.jpg
230-36392 viewsYandi Two balloon loop, Comeng built ore car 1309 one of 226 cars ordered in 1973, note the ladder. Loaded with Yandi Fines ore. Geodata -22.718338, 119.039909 .
150523_8202.jpg
150523 8202392 viewsNelson Point Yard, BHP Billiton SD70ACe unit 4368 is on the fuel tank shunt, is a unit from the last order of eighteen SD70ACe units for BHP Billiton built at Electro-Motive London Ontario, serial 20098203-013.
231-09.jpg
231-09392 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
231-11.jpg
231-11392 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
234-30.jpg
234-30392 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Left hand side cab view. Circa 1998.
235-16.jpg
235-16392 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 leads the afternoon 240 waggon train with second unit Goninan built CM39-8 unit 5630 'Zeus' as the exit the loadout tunnel, notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
238-10.jpg
238-10392 viewsNelson Point, ex Southern Pacific tunnel motor locomotive 8335 an EMD SD40T-2 unit, serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, purchased as a spare parts source for the other SD40 style units BHP Billiton purchased in 2003/04. 19th November 2003. Geodata .
238-25.jpg
238-25392 viewsNelson Point loco overhaul shop, former Union Pacific loco 3523 an EMD SD40-2 model, serial 786170-25 and now numbered 3085 for BHP Billiton Iron One service had only been in operation for eleven days when this shot was taken on the 27th November 2004. Geodata .
6096 files on 305 page(s) 89

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional