Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
050410_0512.jpg
050410 0512440 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
170728_09974.jpg
170728 09974440 viewsBenson Falls, 91 km curve, an empty train blasts up the steep grade behind a triple all General Electric built Dash 9-44CW unit power of 9409 serial 54159 and 9408 both in Pilbara Rail with Robe reporting marks, and 7060 in Pilbara Iron with HI reporting marks. 28th July 2017. GeoData.
6991_001_Welshpool_19880904.jpg
6991 001 Welshpool 19880904440 viewsWelshpool, Goninan workshops, brand new Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079 is lashed down on a road transport float ready for haulage to Port Hedland in this 4th September 1988 image.
Jim Bisdee photo.
22656.jpg
22656440 viewsBassendean, during an Open Day at the Goninan workshops, a new 'Pilbara' cab under construction which will be fitted to a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
080124_1622.jpg
02256 080124 1622440 viewsChapman Siding, view of the hand brake end with F type Interlock coupling, uncoupling lever and hand brake wheel arrangement, control waggon 2256, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
267-21.jpg
267-21440 viewsGoldsworthy Junction, CM40-8M GE rebuild unit 5634 'Boodarie' serial number 8151-07 / 91-120 turns on the power as it passes Goldsworthy Junction relay room and continues along the Newman Mainline with the Sundowner and sister unit 5653. The realigned former Goldsworthy line to the Yarrie and Nimingarra mines can be seen curving away to the left in front of 5634. Friday 12th of April 2002.
224-27.jpg
224-27439 viewsBing siding, mid-train remote units Goninan rebuild CM40-8M GE units 5638 'Mallina' serial 8281-02 / 92-127 leads sister unit 5669. GeoData.
225-03.jpg
225-03439 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach. Flashbutt yard is to the right. GeoData.
230-09.jpg
230-09439 viewsYandi Two balloon loop, empty car side, side view of two Goninan GE CM40-8M rebuilds from different ALCo builders. 5654 'Kashima' serial 8412-11/93-145 is from Comeng ALCo M636 unit 5493 while 5637 'De Grey' serial 8181-01/92-123 is from an AE Goodwin ALCo C636 unit 5456. Geodata -22.713725, 119.055762 .
151111_9525.jpg
151111 9525439 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs over the 54.04 km culvert on the West Mainline bound for Cape Lambert viewed from Table Hill.
151111_9544.jpg
151111 9544439 viewsAn empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units crossing Lake Poongkaliyarra.
151111_9573.jpg
151111 9573439 viewsAn empty train is still struggling upgrade at the 98 km post on the Tom Price line behind double General Electric Dash 9-44CW units 9403 serial 53457 wearing ROBE Pilbara Rail livery and 7087 serial 47766 wearing the original Hamersley Iron livery.
232-01.jpg
232-01439 viewsYandi Two entry portal for the loadout tunnel with dust extraction pipes. February 1997. GeoData.
232-34.jpg
232-34439 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
239-28.jpg
239-28439 viewsYandi Two, conveyor belt CV202 failure of the belt on the primary crushing circuit. Shows belt rolls bunched up and sub-station. GeoData.
040805_095643.jpg
CHQY 734 040805 095643439 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 734.
040805_095752.jpg
CHQY 741 040805 095752439 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.
050518_2104.jpg
CHRY 761 050518 2104439 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 761.
051001_5698.jpg
6012 Scotts of Ipswich Qld 051001 5698439 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #18, 6012, a Scotts of Ipswich Qld built flat waggon from September 1970.
050522_2727.jpg
6016 Comeng WA 050522 2727439 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #17, 6016, built by Comeng WA in January 1971, also carries contract no. of 6506-016.
6220 files on 311 page(s) 76

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional