Most viewed - Pilbara negative and digital Albums - Iron Ore |

247-05409 viewsCape Lambert fuel point, Robe River Dash 8 power 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
|
|

222-04408 viewsAt the 105.7 km grade crossing near Gillam Siding, a loaded Yandi train departing behind two General Electric AC6000 units built by GE at their Erie plant. Gillam Siding is at the 97.1 km. GeoData.
|
|

224-09408 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.
|
|

225-04408 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie. Flashbutt yard is to the right. GeoData.
|
|

226-36408 viewsShaw siding 219 km, 5654 'Kashima' serial 8412-11 / 93-145 is the trail or slave remote on the mid-train pair of units, note the large flat fuel tank indicating this unit was a Comeng NSW built ALCo before rebuild. GeoData.
|
|

227-36408 viewsNelson Point, tug boat Warilla, 50 ton bollard pull Z-Peller type, built by Tamar Steel Boats in Launceston in 1982, pulls a loaded carrier clear of B berth.
|
|

228-11408 viewsYandi Two mobile machine parking bay, a new water cart for Henry Walker, operator of the BHP owned mine, WC201 is based on a Caterpillar 777B truck chassis.
|
|

229-18408 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

234-05408 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of left hand side of cab. Circa 1998.
|
|

238-21408 viewsNelson Point loco overhaul shop, former Union Pacific loco 3523 an EMD SD40-2 model, serial 786170-25 and now numbered 3085 for BHP Billiton Iron One service had only been in operation for eleven days when this shot was taken on the 27th November 2004. Geodata .
|
|

239-30408 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls bunched up near the gravity take-up tower. GeoData.
|
|

040805 095703408 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.
|
|

040815 171420408 viewsNelson Point, view of access ladder, brake valve and discharge piping of fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
|
|

050412 0775408 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 502.
|
|

050315 0234408 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0015 in the Earth livery and 0017 and others in the BHP blue and white livery.
|
|

050409 0410408 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 view of front trolley and tarp protecting windscreen. 9th April 2005.
|
|

050421 1178408 viewsAbydos Siding backtrack, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper side view. 21st April 2005.
|
|

110411 10014408 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
|
|

170730 0523408 viewsMarubeni Siding, located on the Roy Hill railway at the 152.5 to the 155.8 km, view looking south. GeoData.
|
|

IC22 070908 0595408 viewsRobe River compressor waggon set IC 22 with air receiver and IC 23 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert yard, August 8, 2007.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
71 |  |
 |
 |
 |
 |
 |
 |
|