Most viewed - Pilbara negative and digital Albums - Iron Ore |

224-29414 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|

160128 00610414 viewsWedgefield, Sims Metal Yard, Goninan rebuilt GE model CM40-8M unit 5661 is now match for the 40 tonne Cat excavator model 330DL as the shears tear the cab to pieces.
|
|

232-16414 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|

239-27414 viewsYandi Two, conveyor belt CV202 failure of the primary crushing circuit conveyor. GeoData.
|
|

040806 092732414 viewsGoldsworthy Junction, weighbridge test waggon 522, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon.
|
|

040815 164711414 viewsNelson Point, CFCLA ballast waggon CHQY type 740 just being delivered to BHP Iron Ore as part of the Rail PACE project, side view.
|
|

050407 0379414 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

050409 0405414 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 side view of cab rear. 9th April 2005.
|
|

060501 3926414 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, generating set and second driving cab module, view of Matisa drive bogie plate. 1st May 2006.
|
|

080116 1369414 viewsChapman Siding, view from the hand brake end with F type Interlock coupling and hand brake wheel arrangement, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 16th January 2008.
|
|

200914 7794414 viewsPilbara Railways Historical Society, a pair of NSWGR 2AE type bogies. 14th September 2020.
|
|

247-37414 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
|
|

267-26414 viewsOn approach to the 39 km Detector Site the Sundowner Special runs along the Newman Mainline behind BHP Iron Ore's Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 with sister 5653 on the rear. Friday 12th of April 2002.
|
|

219-26413 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train into the siding at Goldsworthy as the second driver watches the roll by under the shelter.
|
|

222-02413 viewsAt the 105.7 km grade crossing near Gillam Siding, a loaded Yandi train approaches behind two General Electric AC6000 units built by GE at their Erie plant, BHP 6071 serial 51063 leads sister unit 6074, 6071 has not been named as yet. This road was also the original road into Lynas Find Gold Project, back in the day. GeoData.
|
|

224-27413 viewsBing siding, mid-train remote units Goninan rebuild CM40-8M GE units 5638 'Mallina' serial 8281-02 / 92-127 leads sister unit 5669. GeoData.
|
|

150523 8207413 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0031 with safety slogan 'Safety - It's your life', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|

150523 8244413 viewsNelson Point Yard, loaded ore waggon 6531, a Golynx style waggon built by Goninan in 2007 with asset number of 2038898 out of 5Cr12Ti stainless steel which does away with the need to paint the waggon interiors to prevent wear.
|
|

236-09413 viewsNelson Point, Loco Overhaul Shop, BHP Dash 8 class locomotive 5653 'Chiba', a Goninan 1994 rebuild to GE CM40-8M model, serial 8412-10 / 93-144, drivers side cab view.
|
|

050409 0385413 viewsShell Swagman Roadhouse, Lampson Mack Titan prime mover and eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
67 |  |
 |
 |
 |
 |
 |
 |
|