Most viewed - Pilbara negative and digital Albums - Iron Ore |

040815 164610417 viewsNelson Point, CFCLA ballast waggon CHQY type 730 and 740 both just placed on rail for BHP Iron Ore as part of the Rail PACE project.
|
|

050518 2109417 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 750.
|
|

060723 7825417 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
|
|

22926417 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 units 5473 serial G6047-5 and 5477 serial G6047-9 are undergoing rebuilding into a GE CM40-8M unit, 5473 would emerge rebuilt as 5649 in July 1993, while 5477 would emerge rebuilt in June 1993 as 5648. November 1992.
Jim Bisdee photo.
|
|

23732417 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. January 1993.
Jim Bisdee photo.
|
|

150619 9096417 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left blower fans and filter housing, 5000 litre water tank, 2500 litre water tank, electrical cabinet, grinding hoods each side of bogie.
|
|

110620 2261417 viewsChapman, a loaded train of Chinese built ore waggons by CSR Zhuzhou Rolling Stock Works loaded with lump ore. 20th June 2011.
|
|

200914 7820417 viewsPilbara Railways Historical Society, three four wheel waggons from the Point Samson PWD. All the PWD stock was of 3' 6" gauge. 14th September 2020.
|
|

249-30417 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
|
|

224-17416 viewsBing siding, 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.
|
|

224-25416 viewsBing siding, the afternoon empty to Yandi waits in the loop as a loaded behind two Goninan rebuilt CM40-8M GE units rolls through on the mainline, 5642 'Wallareenya' serial 8281-07 / 92-131 leads sister unit 5637. GeoData.
|
|

225-12416 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, 5669 'Beilun' serial 8412-02 / 95-160 was the final Dash 8 rebuilt for BHP Iron Ore by Goninan as a CM40-8MEFI GE rebuilt from an ALCo, light engine on approach. GeoData.
|
|

227-31416 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
|
|

228-14416 viewsYandi Two mobile machine fuel point. A Caterpillar 16G road motor grader is receiving attention.
|
|

151111 9537416 viewsAn empty train rounds the curve as it emerges through Lockyer Gap and is about to cross Lake Poongkaliyarra.
|
|

150523 8209416 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0034 with safety slogan 'Thank Safe + Work Safe = Go Home Safe', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|

236-12416 viewsNelson Point, Car Dumper Two delivery roads, BHP Dash 8 class locomotive 5636 'Munda', a Goninan 1991 rebuild to GE CM40-8M model, serial 8151-11 / 91-122 with a sister unit await to dump their train of Comeng style waggons, next to them is a string of Golynx style waggons and on the left sits an AC6000 6073 with a Dash 8 awaiting access to Car Dumper Three. The Ore Car Repair Shop is on the right.
|
|

060715 6949416 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 15th July 2006.
|
|

20859416 viewsBassendean, Goninan workshops, sitting outside the locked gates having just been bought down from Port Hedland, Mt Newman Mining's AE Goodwin ALCo C636 unit 5454 serial G6012-3 on a ninety six wheel road float. 5454 will be rebuilt into CM40-8M unit 5641 by June 1992. Image taken January 1992.
Jim Bisdee photo.
|
|

22656416 viewsBassendean, during an Open Day at the Goninan workshops, a new 'Pilbara' cab under construction which will be fitted to a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
65 |  |
 |
 |
 |
 |
 |
 |
|