Most viewed - Pilbara negative and digital Albums - Iron Ore |

170730 0528461 viewsIndee, at the 55 km on the BHP line a loaded train from Yandi is heading north behind Progress Rail Muncie USA built SD70ACe/LCi unit 4400 serial 20118575-010 with second unit 4348. 30th July 2017. GeoData.
|
|

060715 6949461 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 15th July 2006.
|
|

22657461 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|

240-14461 viewsWickham, right hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
|
|

180616 1678461 viewsCooya Pooya, located just south of the 32 km post, a loaded Mesa A train waggon 817, a Centurion Industries WA build, has managed to pull the coupler completely out of waggon 425 a Tomlinson Steel WA built waggon. 16th June 2018. GeoData.
Photo by Roland Depth.
|
|

080621 2796461 viewsWalla back track, BHP track machine TM04 a Plasser Australia unit model 09-3X serial M489. 21st June 2008.
|
|

150619 9163461 viewsWalla back track, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480. 19th June 2015.
|
|

01619-02620 080304 2194461 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1619 slave and 2620 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

TK 09 110620 2273461 viewsChapman, FMG TK type fuel tank waggon TK 09 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

246-24461 viewsCape Lambert, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng style flat fuel tank, while above is GE and Pilbara Cab. 22nd May 2002.
|
|

250-10461 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 on the loop as a loaded train with 210 waggons passes behind a sister pairing of 7072 serial 47751 and 7074 serial 47753. 1550 hrs 21st October 2000.
|
|

267-16461 viewsGoldsworthy Junction, the Sundowner Special is on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in between CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 and sister CM40-8M 5653. This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 can be seen holding track. The road curving around to the left is the Goldsworthy mainline to Boodarie and Finucane Island. Friday 12th of April 2002.
|
|

220-05460 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west past the Yard Limit sign and the 137.5 km grade crossing.
|
|

221-06460 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
|
|

222-02460 viewsAt the 105.7 km grade crossing near Gillam Siding, a loaded Yandi train approaches behind two General Electric AC6000 units built by GE at their Erie plant, BHP 6071 serial 51063 leads sister unit 6074, 6071 has not been named as yet. This road was also the original road into Lynas Find Gold Project, back in the day. GeoData.
|
|

238-04460 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer (IMO: 8300389) sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
|
|

239-07460 viewsView from the Yandi One radial stacker looking north east, the camp for the mine is located a couple of kilometres beyond those front hills. The head drum of the conveyor and the ore stockpile are visible in the corner. GeoData.
|
|

040407 073250460 viewsGoldsworthy Junction, Barclay Mowlem track tamper a Fairmont Jackson model 6700 production and switch tamper serial 153172, runs east along the Goldsworthy line. 7th April 2004.
|
|

050801 4735460 viewsFlash Butt yard, Barclay Mowlem TM 21 a Plasser Australia 09-16 model tamper bar coupled to the clip installing machine. 1st August 2005.
|
|

23731460 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. January 1993.
Jim Bisdee photo.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
59 |  |
 |
 |
 |
 |
 |
 |
|