Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
081225_0542.jpg
081225 0542436 viewsBarker Siding, one of FMG's thirty five ballast waggons, BH 03, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
220-17.jpg
220-17435 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
221-06.jpg
221-06435 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
151111_9568.jpg
151111 9568435 viewsAn empty train struggles upgrade at the 87.5 km post on the Tom Price line behind double General Electric Dash 9-44CW units 9403 serial 53457 wearing ROBE Pilbara Rail livery and 7087 serial 47766 wearing the original Hamersley Iron livery.
151111_9574.jpg
151111 9574435 viewsAn empty train is still struggling upgrade at the 98 km post on the Tom Price line behind double General Electric Dash 9-44CW units 9403 serial 53457 wearing ROBE Pilbara Rail livery and 7087 serial 47766 wearing the original Hamersley Iron livery.
150523_8220.jpg
150523 8220435 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0043 with safety slogan 'ASAP - As safe as possible', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
160128_00789.jpg
160128 00789435 viewsWedgefield, Sims Metal Yard, Goninan rebuilt GE model CM40-8M unit 5661 has the back wall of the cab torn off.
232-10.jpg
232-10435 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
22669.jpg
22669435 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
22927.jpg
22927435 viewsBassendean, Goninan workshops, view of several Mt Newman Mining ALCo units awaiting rebuilding or scrapping. November 1992.
Jim Bisdee photo.
242-13.jpg
242-13435 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
242-32.jpg
242-32435 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2, view of roof. May 2002.
180615_1575.jpg
180615 1575435 viewsWalla Siding, BHP ballast waggon 0226 built from JFE410RW steel by CNR QRRS China. 15th June 2018. Roland Depth image.
243-15.jpg
243-15435 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
6980_001.jpg
6980 001435 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 being built for Mt Newman Mining.
Jim Bisdee photo.
080621_2800.jpg
080621 2800435 viewsWalla back track, BHP track machine BR 34 a Plasser Australia unit model 305 serial M490. 21st June 2008.
150619_9097.jpg
150619 9097435 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left filter housing, 5000 litre water tank, 2500 litre water tank, electrical cabinet, blower fans and filter housing, grinding hoods beside bogie.
080116_1381.jpg
080116 1381435 viewsChapman Siding looking north inside ore waggon 2396. The visible angle iron welded to the floor are covers for the water drain holes.
221-17.jpg
221-17434 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.
222-10.jpg
222-10434 viewsGreen Tank Pool, Pilbara, Western Australia. Geo Data.
6096 files on 305 page(s) 52

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional