Most viewed - Pilbara negative and digital Albums - Iron Ore |

223-13482 viewsPossum Siding, Hamersley Iron loco 7082 a General Electric built Dash 9-44CW serial 47761 leads sister unit 7080 with an empty train just inside the loop waiting to effect a crew change. 21st October 2000.
|
|

170726 9457482 viewsBoodarie, FMG ore waggon pair 2800 (control) and 1799 (slave) of the original design and loaded with fines ore shows evidence of side wall panel replacement and new relining dates. 26th July 2017.
|
|

170727 9627482 viewsWoodstock Siding, a Roy Hill ballast train works north as it is about to cross BHP's Woodstock running lines, General Electric Erie built model ES44ACi unit RHA 1006 serial 62578 leads a side dump, ten ballast hoppers and a ballast plough with a sister unit on the rear. 27th July 2017. GeoData.
|
|

150619 9158482 viewsWalla back track, BHP track machine BR 33 a Plasser Australia unit, BR 33 is a ballast regulator model SSP302 serial M486. 19th June 2015.
|
|

151206 9657482 viewsBoodarie, on a Gavin Transport Drake float, BHP's new track recording vehicle which is a Mermec ROGER 800 imported from Italy. Underbody detail of the testing units.
|
|

200914 7791482 viewsPilbara Railways Historical Society, passenger carriage 'Bellary' was originally built by Clyde Engineering at Granville NSW in 1936 for the NSWGR as a second class railway carriage FS type FS 2143. In 1987 it was purchased by the Society and is named after a local river. 14th September 2020.
|
|

040407 073334481 viewsGoldsworthy Junction, Barclay Mowlem's R.E.L.A.M lease ballast plough, Knox Kershaw KBR 850 model travels east along the Goldsworthy line. 7th April 2004.
|
|

223-16480 viewsPossum Siding, trailing view of Hamersley Iron loco 7080 a General Electric built Dash 9-44CW serial 47759 second unit behind sister locomotive 7082 looking south. 21st October 2000.
|
|

22653480 viewsBassendean, during an Open Day at the Goninan workshops, Robe River's AE Goodwin built ALCo M636 model unit 9411 serial G6060-2 is in the middle of being rebuilt into a GE CM40-8M model. 9411 was built in July 1971, when delivered it carried road number 262.002, then following completion of the construction phase was re-numbered to 1711, before again being re-numbered to 9411. 20th July 1991.
Jim Bisdee photo.
|
|

040412 143415480 viewsNelson Point, BHP ore waggon 3295, one of three hundred and fifty waggons built by Astra Vagoane in Arad Romania during 1988, only seventy-five of these waggons found their way into service. 12th of April 2004.
|
|

197-07479 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.
|
|

221-07479 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
|
|

232-05479 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665 'Rotterdam' serial 8412-10 / 94-156, both are Goninan rebuild CM40-8M GE units with 65 having an L on its' designation as cabless with LocoTrol. 3rd February 1997. GeoData.
|
|

040419 102228479 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, 3/4 view from non-handbrake end, shows access ladder profiles, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
|
|

242-02479 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.
|
|

180614 1342479 viewsGoldsworthy Junction, Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers, the straddle crane SD 1 is a new unit built by Vaia Car model no. TCR-V. GeoData. 14th June 2018.
|
|

219-29478 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train along the siding at Goldsworthy.
|
|

220-19478 viewsTomlinson Steel WA built bottom discharge ore waggon 8115 loaded in the consist of a Yarrie train.
|
|

050801 4739478 viewsFlash Butt yard, BHP clip driving machine, modified from a former Plasser Australia USP 3000 ballast regulator. 1st August 2005.
|
|

040407 073324478 viewsGoldsworthy Junction, Barclay Mowlem's R.E.L.A.M lease ballast plough, Knox Kershaw KBR 850 model travels east along the Goldsworthy line past the dual headed GJ 9 signal. 7th April 2004
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
32 |  |
 |
 |
 |
 |
 |
 |
|