Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
240619_0405.jpg
240619 0405148 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31499 is a master and is bar coupled to slave waggon 36499 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
240619_0427.jpg
240619 0427148 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31478 is a master and is bar coupled to slave waggon 36478 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
240701_2428.jpg
240701 2428148 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31628 is a master and is bar coupled to slave waggon 36628 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
0195_110602_1734.jpg
0195 110602 1734147 viewsRobe River ore waggon 195, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0216_160306_1414.jpg
0216 160306 1414147 viewsRobe River ore waggon 216, built by Nippon Sharyo Nihon, non-handbrake side plate view at Greenpool on the Cape Lambert line. March 6, 2016.
0298_170729_0248.jpg
0298 170729 0248147 viewsRobe River ore waggon 298, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0445_170729_0199.jpg
0445 170729 0199147 viewsRobe River ore waggon 445, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0456_170729_0196.jpg
0456 170729 0196147 viewsRobe River ore waggon 456, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0611_110602_1638.jpg
0611 110602 1638147 viewsRobe River ore waggon 611, built by Tomlinson Steel WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0667_110602_1668.jpg
0667 110602 1668147 viewsRobe River ore waggon 667, built by Tomlinson Steel WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0685_110602_1593.jpg
0685 110602 1593147 viewsRobe River ore waggon 685, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view, with rake 5 number magnet, at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0827_160306_1479.jpg
0827 160306 1479147 viewsRobe River ore waggon 827, built by Centurion Industries WA, fixed coupler handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0897_160306_1587.jpg
0897 160306 1587147 viewsRobe River ore waggon 897, built by Centurion Industries WA, fixed coupler non-handbrake side loaded partial view, shows drop rib detail, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0931_160306_1595.jpg
0931 160306 1595147 viewsRobe River ore waggon 931, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
1109_160306_1336.jpg
1109 160306 1336147 viewsRobe River ore waggon 1109, built by Bradken Rail Qld in April 2012, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
1157_160306_1613.jpg
1157 160306 1613147 viewsRobe River ore waggon 1157, built by Bradken Rail Qld in April 2012, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
8003_070915_0885.jpg
8003 070915 0885147 viewsRobe River diesel fuel tank waggons 8003, 8002 and 8001 running loaded at the front of an empty ore train. 8003 was built by Comeng NSW in March 1979 with a 100,000 litre capacity whilst 8002 and 8001 were built by the same builder with a 45,000 litre capacity in September 1972. At the 73.4 km on the Deepdale line, Western Creek, September 15, 2007.
0156_180616_1726.jpg
0156 180616 1726147 viewsRobe River ore waggon 156, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0414_180616_1694.jpg
0414 180616 1694147 viewsRobe River ore waggon 414, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0539_180616_1713.jpg
0539 180616 1713147 viewsRobe River ore waggon 539, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
6217 files on 311 page(s) 298

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional