Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
0607_180616_1728.jpg
0607 180616 1728122 viewsRobe River ore waggon 607, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1083_180616_1734.jpg
1083 180616 1734122 viewsRobe River ore waggon 1083, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1182_210322_9762.jpg
1182 210322 9762122 viewsRobe River ore waggon 1182, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021
IC20-CB07_240619_0323.jpg
IC20-CB07 240619 0323122 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver and IC 21 with two Kaeser air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.
240701_2497.jpg
240701 2497122 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31591 is a master and is bar coupled to slave waggon 36591 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
0102_160306_1535.jpg
0102 160306 1535121 viewsRobe River ore waggon 102, shows rear drop rib which is a feature of the Centurion Industries WA builds, fixed coupler non-handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0136_110602_1701.jpg
0136 110602 1701121 viewsRobe River ore waggon 136, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0170_081209_0114.jpg
0170 081209 0114121 viewsRobe River ore waggon 170, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0178_170729_0218.jpg
0178 170729 0218121 viewsRobe River ore waggon 178, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0190_081209_0162.jpg
0190 081209 0162121 viewsRobe River ore waggon 190, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0231_170513_8764.jpg
0231 170513 8764121 viewsRobe River ore waggon 231, built by Nippon Sharyo Nihon, handbrake side partially loaded view, Cape Lambert yard, May 13, 2017.
0250_160306_1344.jpg
0250 160306 1344121 viewsRobe River ore waggon 250, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0300_081209_0149.jpg
0300 081209 0149121 viewsRobe River ore waggon 300, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0433_160727_0959.jpg
0433 160727 0959121 viewsRobe River ore waggon 432, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
0458_160727_0982.jpg
0458 160727 0982121 viewsRobe River ore waggon 458, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
0483_141124_6776.jpg
0483 141124 6776121 viewsRobe River ore waggon 483, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0565_141124_6839.jpg
0565 141124 6839121 viewsRobe River ore waggon 565, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0577_141124_6859.jpg
0577 141124 6859121 viewsRobe River ore waggon 577, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0585_060722_7612.jpg
0585 060722 7612121 viewsRobe River ore waggon 585, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
0610_081209_0171.jpg
0610 081209 0171121 viewsRobe River ore waggon 610, built by Tomlinson Steel WA, fixed coupler non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
6096 files on 305 page(s) 285

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional