Most viewed - Pilbara negative and digital Albums - Iron Ore |

200914 iPhone IMG 8841511 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th September 2020.
|
|

219-04510 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7090 serial 47769 and 7089 idle away waiting their next loaded train to push out.
|
|

180615 1496510 viewsMooka Yard, side view of named BHP's Progress Rail built EMD SD70ACe unit 4486 'Jenny Parkinson' serial 20148001-019. 15th June 2018.
Roland Depth photo.
|
|

151206 9654510 viewsBoodarie, parked up in a parking bay just out of town on a Sunday awaiting delivery on the following day, behind a Gavin Transport Mack Titan 600 on a Drake float, BHP's new track recording vehicle which is a Mermec ROGER 800 imported from Italy. ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
|
|

200914 iPhone IMG 8840510 viewsPilbara Railways Historical Society, view into the toilet cubicle. 14th September 2020.
|
|

200914 7811509 viewsPilbara Railways Historical Society, the Locotrol 'cab' from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Eventually the three locomotives had driving cabs fitted. Donated to the Society around 1998? 14th September 2020.
|
|

267-19508 viewsGoldsworthy Junction, CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 leads the Sundowner Special on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in the middle and sister CM40-8M 5653 bringing up the rear.
This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 are holding track.
They can be seen behind the signal sitting on the transfer road.
Friday 12th of April 2002.
|
|

203-13507 viewsBing Siding, a loaded BHP Iron Ore train with a pair of CM40-8M units on the lead are on the mainline as the cross the empty train behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068.
|
|

207-07507 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
|
|

218-19507 viewsDe Grey River Bridge, a loaded GML train with the original AE Goodwin designed and Tomlinson Steel Perth and Scotts of Ipswich built waggons.
|
|

180614 1332507 viewsAllen Siding, recycled rail from the Newman Mainline, a section of rail from the 222.8 km between Shaw and Hesta has made its way to the 45 km on the Goldsworthy line. GeoData. 14th June 2018.
|
|

041225 064654507 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 asset number 2031703. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
|
|

200914 7758507 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
|
|

269-14507 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

218-05506 viewsDe Grey River Bridge, former road and rail, now only rail bridge for the Goldsworthy line, looking east, river is in flood, wide angle view.
|
|

040409 121940506 viewsBoodarie, Goninan built Golynx waggon 8416 with serial number 950088-326 from November 2011, which is a modified version of the BHP mainline waggons for service on the Goldsworthy system as a bottom discharge waggon. 9th of April 2004.
|
|

196-14505 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

218-09505 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
|
|

218-31505 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7090 serial 47769 and 7089 idle away waiting their next loaded train to push out.
|
|

040407 072701505 viewsGoldsworthy Junction, Barclay Mowlem's Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc. 7th April 2004.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
25 |  |
 |
 |
 |
 |
 |
 |
|