Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
0873_081209_0135.jpg
0873 081209 0135145 viewsRobe River ore waggon 873, built by Centurion Industries WA,non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0933_160306_1575.jpg
0933 160306 1575145 viewsRobe River ore waggon 933, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0945_170728_09920.jpg
0945 170728 09920145 viewsRobe River ore waggon 945, built by Centurion Industries WA, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
1005_060722_7602.jpg
1005 060722 7602145 viewsRobe River ore waggon 1005, built by Bradken Rail Qld in December 2005, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
1009_060722_7599.jpg
1009 060722 7599145 viewsRobe River ore waggon 1009, built by Bradken Rail Qld in December 2005, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
1012_160306_1348.jpg
1012 160306 1348145 viewsRobe River ore waggon 1012, built by Bradken Rail Qld in December 2005, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
1027_141124_6831.jpg
1027 141124 6831145 viewsRobe River ore waggon 1027, built by Bradken Rail Qld in January 2006, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
1067_170513_8729.jpg
1067 170513 8729145 viewsRobe River ore waggon 1067, built by Bradken Rail Qld in April 2012, rotary coupler end handbrake side loaded view, Cape Lambert yard, May 13, 2017.
1099_170728_09919.jpg
1099 170728 09919145 viewsRobe River ore waggon 1099, built by Bradken Rail Qld in March 2012, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
IC22_060722_7637.jpg
IC22 060722 7637145 viewsRobe River compressor waggon set IC 22 with air receiver and IC 23 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert, July 22, 2006.
1031_180616_1649.jpg
1031 180616 1649145 viewsRobe River ore waggon 1031, built by Bradken Rail Qld in January 2006, fixed coupler non-handbrake side loaded view, instrumented vehicle, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
240619_0448.jpg
240619 0448145 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31621 is a master and is bar coupled to slave waggon 36621 built by China Northen as a Q type in 11/2022. Captured on June 19, 2024.
240701_2481.jpg
240701 2481145 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31569 is a master and is bar coupled to slave waggon 36569 built by China Northen as a Q type in 12/2022. Captured on July 1, 2024.
0074_050110_175326.jpg
0074 050110 175326144 viewsRobe River ore waggon 074, built by Nippon Sharyo Nihon, handbrake side empty view. Of note is it is rotary bar coupled to 730. Harding Siding on the Cape Lambert line, 1753 hours, January 10, 2005.
0105_060716_7196.jpg
0105 060716 7196144 viewsRobe River ore waggon 105, built by Nippon Sharyo Nihon, fixed coupler end handbrake side loaded view at the 71 km on the Deepdale line, Western Creek, July 16, 2006.
8003_060716_7199.jpg
8003 060716 7199144 viewsRobe River diesel fuel tank waggon 8003 running empty on the rear of a loaded ore train, built by Comeng NSW in March 1979 with a 100,000 litre capacity, at the 71 km on the Deepdale line, Western Creek, July 16, 2006.
0002_081209_0167.jpg
0002 081209 0167144 viewsRobe River ore waggon 002, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0007_160306_1234.jpg
0007 160306 1234144 viewsRobe River ore waggon 007, built by Nippon Sharyo Nihon, rotary coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0009_170513_8723.jpg
0009 170513 8723144 viewsRobe River ore waggon 009, built by Nippon Sharyo Nihon, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0016_160306_1244.jpg
0016 160306 1244144 viewsRobe River ore waggon 016, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
6096 files on 305 page(s) 227

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional