Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
150314_7768.jpg
150314 7768294 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2077 view of park brake assembly. March 14. 2015.
150314_7783.jpg
150314 7783294 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2079 builders plate shows CSR Yangtze, stamped for 12/2014. March 14. 2015.
081225_0561.jpg
081225 0561294 viewsBarker Siding, one of FMG's thirty five ballast waggons, BH 04, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
081225_0573.jpg
081225 0573294 viewsBarker Siding, view of two of FMG's ballast waggons F type couplings, electric and air connections. 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
250501_0344.jpg
250501 0344293 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3383 - GA 3384, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0354.jpg
250501 0354293 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3153 - GA 3154, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0432.jpg
250501 0432293 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3267 - GA 3268, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0483.jpg
250501 0483293 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2739 - GA 2740, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250430_10060.jpg
250430 10060293 viewsBoodarie, a totally mismatched FMG waggon pair, 1599 [slave] is an original CSR Zhuzhou build from 2007, and the renumbered 2600 [master] is an CRRC Yangtze build, second style, which only started appearing from 2014 and was originally 8366. Loaded train May 1, 2025.
210510_1143.jpg
210510 1143292 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 010 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
250501_0351.jpg
250501 0351292 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2411 - GA 2412, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0449.jpg
250501 0449292 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2423 - GA 2424, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0461.jpg
250501 0461292 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2377 - GA 2378, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0533.jpg
250501 0533292 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2069 - GA 2070, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0539.jpg
250501 0539292 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3387 - GA 3388, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
250501_0549.jpg
250501 0549292 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2497 - GA 2498, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0553.jpg
250501 0553292 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2817 - GA 2818, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
253-05.jpg
253-05291 viewsDugite near the 64 km on the Dampier - Tom Price railway, a loaded Hamersley Iron train headed up by General Electric 9-44CW unit 7078, from the original order with serial number 47757 roll past an empty train on the passing track with second unit 7076.
250501_0390.jpg
250501 0390291 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3053 - GA 3054, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0420.jpg
250501 0420291 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2607 - GA 2608, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
6096 files on 305 page(s) 193

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional