Most viewed - Pilbara negative and digital Albums - Iron Ore |

284-09337 viewsNarngulu, Geraldton, former Westrail P class loco P 2003 'Shire of Victoria Plains' built by Goninan WA as a GE CM25-8 model with serial number 6320-02 / 90-088 sits in the yard on empty grain waggons with sister loco P 2014. November 9, 2004.
|
|

250501 0365337 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2829 - GA 2830, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0376337 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2649 - GA 2650, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0388337 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2699 - GA 2700, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0487337 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3147 - GA 3148, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0492337 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2095 - GA 2096, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

07687-08688 200412 6178337 viewsBoodarie, part of a loaded FMG train, painted ore waggon pair 7687 - 8688 built by CRRC Yangtze Rolling Stock Co. of China in 2018, 8688 waggon view, it features mural painting by students of South Hedland High School and was painted in August 2018. April 12, 2020.
|
|

255-11336 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.
|
|

269-06336 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

258-11336 viewsNelson Point, Goninan GE rebuild C36-7M unit 5513 serial 4839-02 / 88-078 is in the process of being removed from site bound for Goninan, Bassendean, Perth. May 2002.
|
|

258-27336 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068. Early May 2002.
|
|

258-29336 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068. Early May 2002.
|
|

250501 0424336 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2169 - GA 2170, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0539336 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3387 - GA 3388, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
|
|

BH 11 081225 0563336 viewsBarker Siding, one of FMG's thirty five ballast waggons, BH 11, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
|
|

210510 1106335 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 014 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

256-37335 viewsAt the 89.6 km grade crossing the loaded Robe River waggons across the crossing. May 2002.
|
|

258-21335 viewsNelson Point, old Loco Prep, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. May 2002.
|
|

250501 0311335 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2025 - GA 2026, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0352335 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2755 - GA 2756, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
190 |  |
 |
 |
 |
 |
 |
 |
|