Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
250501_0454.jpg
250501 0454340 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2617 - GA 2618, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0455.jpg
250501 0455340 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2675 - GA 2676, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0508.jpg
250501 0508340 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2239 - GA 2240, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
243-32.jpg
243-32339 viewsNelson Point departure yard, no. 2 end view of BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan WA in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
258-22.jpg
258-22339 viewsNelson Point, old Loco Prep, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. May 2002.
284-07.jpg
284-07339 viewsNarngulu yard, XEB type hopper waggon XEB 24490 built by Westrail Midland Workshops in 1976 as part of a batch of forty-one XE type waggons for ilmenite cartage, and fitted with vacuum bypass pipes and recoded in ~1983 to XEB, seen here labelled for zircon traffic. November 8, 2004.
250501_0453.jpg
250501 0453339 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2321 - GA 2322, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
150314_7762.jpg
150314 7762339 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2231 side view showing the logo and details, the yellow circle designates the rotary coupler end. March 14. 2015.
210322_9571.jpg
210322 9571338 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 079 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
210510_1110.jpg
210510 1110338 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 010 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
210510_1149.jpg
210510 1149338 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 004 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
256-14.jpg
256-14338 views89.6 km, Toyota Landcruiser HJ75, waiting for a train. May 2002.
250501_0316.jpg
250501 0316338 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2775 - GA 2776, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0445.jpg
250501 0445338 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3315 - GA 3316, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0447.jpg
250501 0447338 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3511 - GA 3512, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0503.jpg
250501 0503338 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2233 - GA 2234, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0519.jpg
250501 0519338 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2765 - GA 2766, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0543.jpg
250501 0543338 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2597 - GA 2598, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0550.jpg
250501 0550338 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2835 - GA 2836, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
150314_7768.jpg
150314 7768338 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2077 view of park brake assembly. March 14. 2015.
6220 files on 311 page(s) 189

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional