Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
250501_0531.jpg
250501 0531350 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3433 - GA 3434, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
250501_0540.jpg
250501 0540350 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2743 - GA 2744, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
210510_1100.jpg
210510 1100349 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 020 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
253-28.jpg
253-28349 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggons, coupling of CHRY 755 and CHRY 757.
256-23.jpg
256-23349 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train passes sister unit 9414 heading up a loaded train. May 2002.
283-11.jpg
283-11349 viewsHarding Siding on the Robe River line at the 42 kilometre post looking in the down direction towards Deepdale. Recently extended north end of the siding to accommodate the soon to be West Angelas traffic and longer trains. 22nd of May 2002.
250501_0337.jpg
250501 0337349 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3051 - GA 3052, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0356.jpg
250501 0356349 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3149 - GA 3150, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
233-26.jpg
233-26348 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train around at 1.2 km/h with assistance from two sister units, the end of the 112 waggon or one rake consist can be seen in the middle background. GeoData.
233-34.jpg
233-34348 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.
257-15.jpg
257-15348 viewsFlash Butt yard, Locotrol I remote waggon 2626 which is modified from a Comeng ore waggon in the 1980s, Locotrol II remote waggon 661 modified from a Magor USA ore waggon in the late 1980s and Locotrol I remote waggon 2065 modified Comeng ore waggon in the 1980s. Late 2001.
258-16.jpg
258-16348 viewsNelson Point, old Loc Prep. Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is waiting to be removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. May 2002.
258-26.jpg
258-26348 viewsNelson Point, old Loc Prep. Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is waiting to be removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. May 2002.
258-32.jpg
258-32348 viewsNelson Point, Wheel Lathe shop with Ore Car Repair Shop and Yard Control behind it. General Electric built AC6000 locomotive 6074 'Kalgan' is out the front. Early May 2002.
250501_0305.jpg
250501 0305348 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2039 - GA 2040, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0308.jpg
250501 0308348 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2249 - GA 2250, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0327.jpg
250501 0327348 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2971 - GA 2972, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0400.jpg
250501 0400348 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2735 - GA 2736, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0401.jpg
250501 0401348 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3001 - GA 3002, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0552.jpg
250501 0552348 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2705 - GA 2706, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
6220 files on 311 page(s) 185

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional