210510 1113352 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 007 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

255-09352 viewsSiding Three looking south at the south end points, switch machine and various cabinets and solar panels and DD or dragging equipment detector bars. May 2002.
|
|

255-34352 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the right heading around to join the Cape Lambert to Deepdale line. Train Control board for crews to change channels. May 2002.
|
|

284-30352 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
|
|

250501 0346352 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3243 - GA 2444, built in China by CSR Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0409352 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2057 - GA 2058, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

150314 7764352 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2231 end view showing where the bar coupling will go and the pipe and electrical connection for the married pair. March 14. 2015.
|
|

210510 1097351 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km the Rio Tinto's Gemco Rail built rail train consist rounds the curve as it heads to the 84 km. 10th May 2021. Location.
|
|

256-22351 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train into the passing track. 9417 was the first CM40-8M rebuild carried out by Goninan in 1989, it was originally an ALCo built C636 unit for Spokane Portland & Seattle numbered 340 with serial number 6010-1, it went onto to be Burlington Northern 4366 and then purchased for Robe River in late 1980 as a parts source. When finally rebuilt by Goninan in June 1989 it had new serial number of 6266-5 / 89-83 and replaced the original 9417 which was scrapped in 1979. May 2002.
|
|

257-29351 viewsGoldsworthy Junction looking north as an empty train approaches, the line curving in from the right in the Goldsworthy or Yarrie line. The dual searchlight signal is GJ 9 and is so positioned to allow approaching trains to see the junction signal, like a repeater. Late 2001.
|
|

283-15351 viewsAt the 45.4 km grade crossing on the Robe River line, loaded train easers around the curve behind the standard quad Goninan CM40-8M units led by 9414 serial number 8206-11 / 91-124 and rebuilt from the final of the original five ALCo units ordered from construction. 22nd of May 2002.
|
|

258-07351 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-08 / 87-076 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
|
|

258-23351 viewsNelson Point, old Loco Prep, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. May 2002.
|
|

250501 0418351 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2745 - GA 2746, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0469351 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2859 - GA 2860, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

100329 8041350 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.
|
|

210510 1137350 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 016 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

210510 1145350 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 008 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

240701 2735350 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. July 1, 2024.
|
|

284-36350 viewsBing Siding, 18 km south of Nelson Point and BHP's GE built AC6000 unit 6075 'Newman', serial number 51097, holds the mainline with a loaded train and EMD SD40R unit 3095 as second unit. Late 2004.
|
|