Most viewed - Pilbara negative and digital Albums - Iron Ore |

283-15325 viewsAt the 45.4 km grade crossing on the Robe River line, loaded train easers around the curve behind the standard quad Goninan CM40-8M units led by 9414 serial number 8206-11 / 91-124 and rebuilt from the final of the original five ALCo units ordered from construction. 22nd of May 2002.
|
|

258-20325 viewsNelson Point, old Loc Prep. Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is waiting to be removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. May 2002.
|
|

284-29325 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
|
|

130720 1448324 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggon 0214 loaded awaiting their next duty.
|
|

210510 1137324 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 016 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

255-14324 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left while the Deepdale line is on the right. Geodata location here. May 2002.
|
|

255-18324 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.
|
|

255-33324 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425, 9410, 9420 and 9414 with serial number 8206-11 / 91-124. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.
|
|

257-05324 viewsFlash Butt yard BHP's stored Goninan WA ALCo C636 to GE C36-7M rebuild unit 5512 awaits its fate. Rebuilt in 1988 at Goninan's Welshpool factory from a 1970 AE Goodwin built ALCo C636 with serial number G6041-1 and road number 5455 and assigned new serial number 4839-01 / 88-077. It was delivered in Mount Newman Mining orange and was named Hesta. Late 2001.
|
|

258-25324 viewsNelson Point, old Loco Prep, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. May 2002.
|
|

240701 2750324 viewsPilbara Railways Historical Society, passenger carriage 'Weelumurra' was originally built by Clyde Engineering at Granville NSW in 1936 for the NSWGR as a second class railway carriage FS type FS 2138. In 1975 it was purchased by the Society and is named after a local river. July 1, 2024.
|
|

284-31324 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
|
|

250501 0433324 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2687 - GA 2688, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

233-26323 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train around at 1.2 km/h with assistance from two sister units, the end of the 112 waggon or one rake consist can be seen in the middle background. GeoData.
|
|

251-08323 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5507 panel side view of Goldsworthy Joint Venture lettering. One of only three units to carry such. 22nd April 2000.
|
|

252-21323 viewsNelson Point BHP Iron Ore's General Electric built AC6000 unit 6074 'Kalgan' serial number 51066 is shutdown near the wheel lathe. Early December 2001.
|
|

210322 9575323 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 091 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

255-15323 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.
|
|

269-02323 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

258-26323 viewsNelson Point, old Loc Prep. Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is waiting to be removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. May 2002.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
182 |  |
 |
 |
 |
 |
 |
 |
|