Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
050704_3997.jpg
050704 3997331 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons, empty tank waggons transported back to Port Hedland from Newman on the rear of loaded ore trains.
100329_8041.jpg
100329 8041331 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.
243-26.jpg
243-26331 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
251-20.jpg
251-20331 viewsNelson Point wheel lathe, BHP's General Electric built AC6000 model 6074 serial 51066 and yet to be named idles away outside the shop. 22nd April 2000.
210322_9570.jpg
210322 9570331 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 095 on a loaded ballast rake, close up of the B end. Location is roughly here. 22nd March 2021.
255-10.jpg
255-10331 viewsSiding Three looking south at the south end signal for loaded trains or up movements. Various cabinets and DD or dragging equipment detector bars. May 2002.
257-11.jpg
257-11331 viewsFlash Butt yard, Locotrol II remote waggon 661 which is modified from a Magor USA ore waggon in the late 1980s. Late 2001.
234-29.jpg
234-29330 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Cab front on view. Circa 1998.
050518_2200.jpg
050518 2200330 viewsBing Siding. Rear 3/4 view of ballast train and of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
252-14.jpg
252-14330 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 01 is behind the locomotive. Location is roughly here. 24th November 2001.
253-26.jpg
253-26330 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 755.
255-22.jpg
255-22330 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
256-35.jpg
256-35330 viewsAt the 89.6 km grade crossing the loaded train behind the quad CM40-8M working of 9414, 9420, 9410 and 9425 rolls across the crossing and heads down the 1.26 percent grade. 9410 (2nd) was built by Comeng NSW as an ALCo M636 model in November 1975 with serial number C6098-05 for Mount Neman Mining with road number 5500, it was sent to Goninan but not rebuilt. Eventually sold to Robe and rebuilt by Goninan WA to an CM40-8M model in March 1996 with serial number 2160-03/96-202. May 2002.
257-28.jpg
257-28330 viewsGoldsworthy Junction looking north as an empty train approaches, the line curving in from the right in the Goldsworthy or Yarrie line. The dual searchlight signal is GJ 9 and is so positioned to allow approaching trains to see the junction signal, like a repeater. Late 2001.
268-26.jpg
268-26330 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
284-06.jpg
284-06330 viewsNarngulu yard, XE type hopper waggon XE 24477 built by Westrail Midland Workshops in 1976 as part of a batch of forty-one waggons for ilmenite cartage, seen here labelled for zircon traffic. November 8, 2004.
250501_0347.jpg
250501 0347330 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2589 - GA 2590, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
150314_7776.jpg
150314 7776330 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2080 side view showing the park brake arrangement. March 14. 2015.
225-23.jpg
225-23329 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
241-23.jpg
241-23329 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Drivers side cab view. June 2002.
6096 files on 305 page(s) 179

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional