Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
250501_0554.jpg
250501 0554368 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2931 - GA 2932, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
226-14.jpg
226-14367 viewsShaw North, 216.5 km, expanded view with arrival signal SWN 3 Shaw North 3 which is at the top of the steep 1.5 percent climb that south bound empties face. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with the north end points and the departure signals and repeater posts due to the large curve loaded trains face. GeoData.
226-21.jpg
226-21367 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track. GeoData.
233-31.jpg
233-31367 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
050518_2088.jpg
CHRY 754 050518 2088367 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 754.
110411_10024.jpg
0015 Comeng WA 110411 10024367 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
246-12.jpg
246-12367 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
251-13.jpg
251-13367 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5513 serial number plate. 22nd April 2000.
252-37.jpg
252-37367 viewsBoodarie, a loaded Yarrie train is approaching the yard behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
210322_9579.jpg
210322 9579367 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 075 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
210322_9585.jpg
210322 9585367 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake, view of A end. Location is roughly here. 22nd March 2021.
210510_1102.jpg
210510 1102367 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 018 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
210510_1116.jpg
210510 1116367 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 004 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
257-12.jpg
257-12367 viewsFlash Butt yard, Locotrol I remote waggon 2065 which is modified from a Comeng ore waggon in the 1980s. Late 2001.
284-18.jpg
284-18367 viewsNarngulu, Geraldton, former Westrail P class loco P 2004 'Shire of Dalwallinu' built by Goninan WA as a GE CM25-8 model with serial number 6320-12 / 90-099 sits in the yard on empty mineral sand train waiting to run to Eneabba. November 9, 2004.
250501_0303.jpg
250501 0303367 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2539 - GA 2540, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0304.jpg
250501 0304367 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2943 - GA 2944, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0307.jpg
250501 0307367 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2197 - GA 2198, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0435.jpg
250501 0435367 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2627 - GA 2628, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
222-22.jpg
222-22366 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie brings an empty train to a stop with 7091 for a crew change.
6220 files on 311 page(s) 175

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional