Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
234-18.jpg
234-18341 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Circa 1998.
234-32.jpg
234-32341 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
040815_164812.jpg
040815 164812341 viewsNelson Point, CFCLA ballast waggon CHQY type 730, view from handbrake end.
050518_2114.jpg
050518 2114341 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746.
050704_3982.jpg
050704 3982341 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, detail of the A end and bogie and the B end of 0018, both wearing the BHP Billiton Earth livery.
050704_3998.jpg
050704 3998341 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons, empty tank waggons transported back to Port Hedland from Newman on the rear of loaded ore trains.
060429_3726.jpg
060429 3726341 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining in 1970 by Scotts of Ipswich, one of a batch of nine, one of a batch of nine in the series 6005-6013.
050414_0949.jpg
050414 0949341 viewsFlash Butt yard, Speno Australia's RR24 model 24 stone rail grinder serial M20 before it had id stickers fitted, this unit was later stickered as RG 1, rear view of the air compressor and driving module. 14th April 2005.
050625_3595.jpg
050625 3595341 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
252-24.jpg
252-24341 viewsAbydos area, known as the China Wall or London Wall.
252-35.jpg
252-35341 viewsBoodarie, a loaded Yarrie train is crossing the Roebourne Rd at the 9.6 km behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
254-24.jpg
254-24341 viewsBing Siding, an empty train departs behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Second unit is Goninan rebuilt CM40-8MEFI locomotive 5668. September 2001.
255-04.jpg
255-04341 viewsSiding Three back track, Robe 9456 Tamper 1, a Fairmont Tamper Mk VI switch tamper machine. May 2002.
268-04.jpg
268-04341 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
240701_2786.jpg
240701 2786341 viewsPilbara Railways Historical Society, ALCo built locomotive model S-2 serial 69214 built in 1940 for the Spokane, Portland and Seattle as their #21 and retired in 1964 before coming to Australia in September 1965, numbered 007 and called 'Mabel'. Retired in December 1972 and donated to the Society in 1976. July 1, 2024.
250501_0434.jpg
250501 0434341 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3601 - GA 3602, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
231-20.jpg
231-20340 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
232-23.jpg
232-23340 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
233-27.jpg
233-27340 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
235-07.jpg
235-07340 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
6096 files on 305 page(s) 170

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional