Most viewed - Pilbara negative and digital Albums - Iron Ore |

051001 5676349 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks. 1st October 2005.
|
|

060501 3913349 viewsAbydos Siding backtrack, Speno rail grinder RG 2, third grinding module and driving cab. 1st May 2006.
|
|

060501 3920349 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, first grinding module. 1st May 2006.
|
|

100717 0680349 viewsFlash Butt yard, new rail stock carrier waggon 6024, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

110619 1882349 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #12, 6209, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

150619 9078349 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting.
|
|

080304 2199349 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1633 slave and 2634 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

243-31349 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

249-03349 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-13349 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

251-14349 viewsNelson Point, BHP's retired Goninan WA's ALCo C636 to GE C36-7M rebuilds, these were the first time in the world that an ALCo C636 had been rebuilt into an GE C36-7, are lined up near the service shop awaiting their fate. The line is 5510, 5506, 5508, 5512, 5513, 5507, 5509, 5511, and, 5513. They had recently been displaced due to the arrival of the AC6000 units which also took their name plates. Only two units would go on to survive 5507 and 5508. 22nd April 2000.
|
|

252-19349 viewsBetween Pelican and Possum sidings, bridge at the 220.6 km. Location is roughly here.
|
|

268-05349 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

269-13349 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

269-20349 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

110620 2031r349 viewsWalla Siding, empty BHP ore waggon 8414 is a Goninan WA build of the Golynx design built in November 2001 as a bottom discharge waggon for Goldsworthy service with serial number 950088-344. Now converted to rotary dump operation. 20th of June 2011.
|
|

240701 2753349 viewsPilbara Railways Historical Society, passenger carriage 'Conference Car' originally built by Clyde Engineering at Granville NSW in 1935 for the NSWGR as a second class railway carriage FS type FS 2010. In 1975 it was purchased by Hamersley Iron and converted to an inspection vehicle SV 4. When donated to the Society it was repurposed as a conference car. July1, 2024.
|
|

284-18349 viewsNarngulu, Geraldton, former Westrail P class loco P 2004 'Shire of Dalwallinu' built by Goninan WA as a GE CM25-8 model with serial number 6320-12 / 90-099 sits in the yard on empty mineral sand train waiting to run to Eneabba. November 9, 2004.
|
|

222-36348 viewsSomewhere on the original single line section between Gull and Rosella a pair of Hamersley Iron General Electric Dash 9-44CW's built by GE at Erie power a loaded train towards Dampier from the passing track back onto the mainline following a crew change.
|
|

224-24348 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073 as a loaded behind two CM40-8M units rolls through on the mainline. GeoData.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
160 |  |
 |
 |
 |
 |
 |
 |
|