Most viewed - Pilbara negative and digital Albums - Iron Ore |

227-22383 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind Goninan CM40-8M GE rebuilds 5649 'Pohang' serial 8412-07/93-140 and 5651 with third unit an General Electric AC6000. GeoData.
|
|

228-26383 viewsYandi Two balloon loop, the afternoon empty train arrives at the load-out tunnel behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
|
|

230-37383 viewsYandi Two balloon loop, 3/4 view from no. 2 end of Goninan rebuilt GE CM40-8M model 5639 'Corunna Downs' serial 8281-03/92-128 from AE Goodwin built ALCo C636 5459. Shows the silver BHP Australia logo, the logo on the hood has been painted out. Geodata -22.718338, 119.039909 .
|
|

231-35383 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

233-21383 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

234-23383 viewsYandi Two, BHP Iron Ore Goninan rebuild CM39-8 GE unit 5630 'Zeus' serial 5831-09 / 88-079 is second unit on the front of a 240 waggon loaded train, engine hood and fuel tank arrangement view, note the difference to the ALCo rebuilds. Circa 1998.
|
|

235-09383 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
|
|

235-08383 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
|
|

CHRY 757 050518 2086383 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 757.
|
|

6705 051001 5622383 viewsFlash Butt yard, BHP flat waggon 6705 with EDI decal and ROA code of AQPY 2916, 55 tonne capacity, unsure of original owner, possible AN AOOX, then cut down to the Pilbara through CFCLA.
|
|

060429 3756383 viewsFlash Butt yard, Pony re-laying waggon, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
|
|

050625 3600383 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480 with support road vehicle TM 10. 25th June 2005.
|
|

050625 3819383 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem sleeper inserter track machine off clear of the running lines. 25th June 2005.
|
|

050801 4746383 viewsFlash Butt yard, BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 1st August 2005.
|
|

051001 5672383 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks view of the light buggy and rods. 1st October 2005.
|
|

6214 Gemco 080621 2732383 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, detail of B end with squeeze rollers and chutes raised.
|
|

0003 Comeng NSW 110411 09993383 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
|
|

0037 CNR - QRRS China 150523 8223383 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0037, one of a second batch delivered in 2015 with safety slogan 'Safety is a core value'.
|
|

247-23383 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|

251-21383 viewsNelson Point wheel lathe, BHP's General Electric built AC6000 model 6074 serial 51066 idles away outside the shop. 22nd April 2000.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
159 |  |
 |
 |
 |
 |
 |
 |
|