Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
080621_2733.jpg
6214 Gemco 080621 2733385 viewsGillman Siding, view from rear of rail recovery and transport train with new Lead-Off Lead-On waggon STTR class STTR 6214 on the end built by Gemco Rail WA.
100717_0683.jpg
6038 Gemco WA 100717 0683385 viewsFlash Butt yard, new rail stock carrier waggon 6038, built by Gemco Rail in late 2009-10 with Barber bogies.
110208_9428.jpg
6203 Comeng WA 110208 9428385 viewsFlash Butt yard, rail recovery and transport train flat waggon rear lead off waggon 6203, built by Comeng WA in January 1977. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
110411_09998.jpg
0018 Comeng WA 110411 09998385 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
110411_10023.jpg
0015 Comeng WA 110411 10023385 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
110619_1882.jpg
6209 Comeng WA 110619 1882385 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #12, 6209, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
241-13.jpg
241-13385 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs, sister unit 5506 and M636 unit 5499. June 2002.
246-08.jpg
246-08385 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
243-34.jpg
243-34385 viewsNelson Point departure yard, hood view of BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan WA in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
247-22.jpg
247-22385 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.
247-25.jpg
247-25385 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
251-07.jpg
251-07385 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5507 builders plate. 22nd April 2000.
251-23.jpg
251-23385 viewsNelson Point hard stand area, BHP's 5631 'Apollo' built new in October 1988 by Goninan as a GE CM39-8 model with serial number 5831-10 / 88-080. One of four such units built in 1988 and delivered in the Mt Newman orange livery. 22nd April 2000.
252-13.jpg
252-13385 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train. Cab side view. Location is roughly here. 24th November 2001.
210322_9581.jpg
210322 9581385 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 112 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
210510_1111.jpg
210510 1111385 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 009 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
253-34.jpg
253-34385 viewsNelson Point hard stand area, riveted flat waggon 202 with three water tanks fitted, view of handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
254-25.jpg
254-25385 viewsBing Siding, an empty train departs behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. September 2001.
256-33.jpg
256-33385 viewsAt the 89.6 km grade crossing the loaded train behind the quad CM40-8M working of 9414, 9420, 9410 and 9425 rolls across the crossing and heads down the 1.26 percent grade. 9414 was built by AE Goodwin NSW as an ALCo M636 model in December 1971 with serial number G-6060-5 and part of the original order for five units. Locomotive was delivered to Robe River in January 1972 with Bechtel Pacific road umber 262.005 for construction use and was renumbered 1714 when that was completed. 9414 was rebuilt by Goninan WA in November 1991 to become an CM40-8M model with serial number 8206-11 / 91-124. May 2002.
267-31.jpg
267-31385 viewsAt the 39 km, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands with the Sundowner Special alongside the AEI reader at the 39 km detector site on the Newman mainline. This was a special for the 25 years of the Alstom / BHP service agreement. Friday 12th of April 2002.
6220 files on 311 page(s) 157

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional