Most viewed - Pilbara negative and digital Albums - Iron Ore |

8500 Tomlinson Steel 060714 6894388 viewsGarden Siding, flat waggon 8500, originally built by Tomlinson Steel WA for Goldsworthy Mining as one of six 55 ton flat waggons built in 1966, and later modified by BHP to increase its capacity.
|
|

050625 3817388 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem track lifter track machine off clear of the running lines. 25th June 2005.
|
|

050801 4747388 viewsFlash Butt yard, BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 1st August 2005.
|
|

050801 4756388 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc. 1st August 2005.
|
|

6047 Gemco WA 100717 0688388 viewsFlash Butt yard, new rail winch waggon 6047 obstructed by scrub, view from A end showing rail ramps, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

02528 080304 2206388 viewsThomas Yard, down the rail welding end, side view of control waggon 2528, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

248-11388 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings. Approximate location. 24th April 2004.
|
|

249-26388 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo. Approximate location. 18th December 1999.
|
|

251-14388 viewsNelson Point, BHP's retired Goninan WA's ALCo C636 to GE C36-7M rebuilds, these were the first time in the world that an ALCo C636 had been rebuilt into an GE C36-7, are lined up near the service shop awaiting their fate. The line is 5510, 5506, 5508, 5512, 5513, 5507, 5509, 5511, and, 5513. They had recently been displaced due to the arrival of the AC6000 units which also took their name plates. Only two units would go on to survive 5507 and 5508. 22nd April 2000.
|
|

252-02388 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, ballast plough waggon BP 02 is on the end of a ballast rake being loaded. BP 02 has been converted from an Nippon Sharyo ore waggon with the mounting of an air compressor on top and the fitting of a plough blade, the waggon is also loaded with ballast to ballast the plough. Location is roughly here. 24th November 2001.
|
|

252-27388 viewsAbydos area, known as the China Wall or London Wall.
|
|

255-21388 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
|
|

267-11388 viewsGoldsworthy Junction, BHP's 1230 empty departure mid-train units Goninan rebuild CM40-8M GE units 5651 'Tobata' serial number 8412-08 / 93-142 and 5645 'Sherlock' serial number 8281-11 / 92-134 104 waggons from the lead with 104 waggons trailing. The line curving away to the left is the Goldsworthy line to Boodarie and Finucane Island. 1247 hrs Friday 12th of April 2002.
|
|

9024 Comeng 030712 143256388 viewsNelson Point, empty BHP ore waggon 9024 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. July 12, 2003.
|
|

284-19388 viewsNarngulu, Geraldton, former Westrail P class loco P 2004 'Shire of Dalwallinu' built by Goninan WA as a GE CM25-8 model with serial number 6320-12 / 90-099 sits in the yard on empty mineral sand train waiting to run to Eneabba. November 9, 2004.
|
|

220-31387 viewsGoldsworthy Junction, the afternoon empty departure for Yandi mine behind the standard double Dash 8 power consist of 5649 'Pohang' a Goninan GE rebuild CM40-8M model serial 8412-07 / 93-140 and a sister unit as the split the sticks, the line merging from the right is the former Goldsworthy line from Yarrie and Nimingarra mines. This area is now fully duplicated with LED signals and the Dash 8 units have been scrapped.
|
|

224-24387 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073 as a loaded behind two CM40-8M units rolls through on the mainline. GeoData.
|
|

225-27387 viewsBing siding backtrack, a ballast consist of 17 GML bottom discharge waggons and 6 Difco side dump rip rap waggons, possibly an 'emergency' ballast train for the GML line following flood damage. GeoData.
|
|

228-32387 viewsYandi Two exit portal or loaded car side of load-out tunnel, stacker tip just visible above stock pile, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is active at a time. Geodata -22.719050, 119.040566 .
|
|

229-28387 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 with sister unit 5642 drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |