Most viewed - Pilbara negative and digital Albums - Iron Ore |

233-19389 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

235-10389 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
|
|

0517 Magor USA 050412 0757389 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 517.
|
|

0515 Magor USA 050518 2175389 viewsBing Siding. Side view of 1963 built Magor USA waggon 515, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0001 Comeng NSW 050724 4213389 viewsNelson Point yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970, attached to the Pony as they relay a road in the yard.
|
|

060501 3913389 viewsAbydos Siding backtrack, Speno rail grinder RG 2, third grinding module and driving cab. 1st May 2006.
|
|

247-29389 viewsCape Lambert fuel point, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng build style flat fuel tank, while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
|
|

257-16389 viewsFlash Butt yard, line up of retired power, the final Comeng NSW built ALCo M636 unit 5499 serial number C6096-4 in Mount Newman Mining livery and then the eight withdrawn Goninan ALCo to GE rebuild C36-7M units 5506, 5510, 5512, 5511, 5513, 5507, 5509 and 5508. Late 2001.
|
|

257-26389 viewsGoldsworthy Junction, an empty train runs between the junction and the Broome Rd crossing behind the standard single locomotive 5646 'White Springs', a Goninan 1992 built GE CM40-8 model with serial number 5244-11 / 92-135, one of a pair of new build locos financed by Goldsworthy. Late 2001.
|
|

267-11389 viewsGoldsworthy Junction, BHP's 1230 empty departure mid-train units Goninan rebuild CM40-8M GE units 5651 'Tobata' serial number 8412-08 / 93-142 and 5645 'Sherlock' serial number 8281-11 / 92-134 104 waggons from the lead with 104 waggons trailing. The line curving away to the left is the Goldsworthy line to Boodarie and Finucane Island. 1247 hrs Friday 12th of April 2002.
|
|

269-20389 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

1173 Comeng 110620 2490389 viewsWalla, loaded BHP ore waggon 1173, whilst numbered and the ends and sill are from Comeng WA 1971 build of one hundred and eighty-three waggons, the side walls have been totally replaced with rounded bottoms and Goninan style extra ribs. June 20, 2011.
|
|

227-06388 viewsNelson Point, view along B berth with Shiploader 1, this loader has since been replaced. In the distance now are berths E and F, Redbank Power Station can be seen in the distance. GeoData.
|
|

227-12388 viewsNelson Point, view from rear of Shiploader 2, salt pile, manganese stockpile in the distance, stacker 3, the Port Hedland water tower, then 101-102 sample station and Tertiary Crushing Building One or TCB1, stacker 4 and reclaimer 3 with the under harbour portal in the foreground. GeoData.
|
|

232-00388 viewsYandi Two crushing and screening plant, built and operated by Henry Walker for BHP Iron Ore, overview from the radial stacker feed conveyor. From the left is the primary crusher, the dual secondary crushers can be made out behind the tertiary crushers in the middle and the screenhouse is the large building tot he right, the conveyor leading to the right is CV210. February 1997. GeoData.
|
|

233-16388 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

234-27388 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Cab front on view. Circa 1998.
|
|

235-34388 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the unit has no marker lights and the tank tells it was an AE Goodwin built C636 ALCo before rebuild.
|
|

236-34388 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6071 'Chichester' serial 51063 sits out the front with new windscreen protectors or 'blinkers' fitted.
|
|

0014 Comeng WA 050704 3998388 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons, empty tank waggons transported back to Port Hedland from Newman on the rear of loaded ore trains.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
151 |  |
 |
 |
 |
 |
 |
 |
|