Most viewed - Pilbara negative and digital Albums - Iron Ore |

050414 0946390 viewsFlash Butt yard, Speno Australia's RR24 model 24 stone rail grinder serial M20 before it had id stickers fitted, this unit was later stickered as RG 1, view of the generator and driving module. 14th April 2005.
|
|

050625 3816390 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem sleeper inserter track machine off clear of the running lines. 25th June 2005.
|
|

060501 3917390 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20. 1st May 2006.
|
|

6030 Gemco WA 100717 0672390 viewsFlash Butt yard, new rail stock carrier waggon 6030, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

0018 Comeng WA 110411 10002390 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
|
|

0711 CNR - QRRS China 110606 1750390 viewsFlash Butt yard, CNR-QRRS of China built side dump waggon, built and delivered in early 2011, waggon 0711 awaits the call to duty.
|
|

0034 CNR - QRRS China 150523 8208390 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0034, one of a second batch delivered in 2015 with safety slogan 'Think Safe + Work Safe = Go Home Safe'.
|
|

0710 CNR - QRRS China 150619 9080390 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, A end and bogie detail.
|
|

248-22390 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On N2 is a cab comparison between AE Goodwin built ALCo M636 unit 9412 serial G-6060-3 from December 1971 and originally numbered 262.003 during construction and then 1712 on MLW Dofasco bogies with C636R units 9427 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in January 1987 riding on the ALCo Hi-Ad bogie. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Behind it on N3 is 9413. Approximate location. 24th April 2004.
|
|

249-24390 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking downstream to the west from the middle of the bridge following Cyclone John on 18th December 1999. Approximate location.
|
|

249-36390 viewsBurrup Peninsula gas plant, view of plant. Approximate location. 18th December 1999.
|
|

257-01390 viewsFlash Butt yard BHP's stored Goninan WA ALCo C636 to GE C36-7M rebuild unit 5513 awaits its fate. Rebuilt in 1988 at Goninan's Welshpool factory from a 1970 AE Goodwin built ALCo C636 with serial number G6012-2 and road number 5453 and assigned new serial number 4839-02 / 88-078. It was delivered in Mount Newman Mining orange and was named Kalgan. Late 2001.
|
|

257-32390 viewsGoldsworthy Junction, empty train with second unit BHP Iron Ore loco 5632 'Poseidon' one of four new built GE CM39-8 model locomotives by Goninan in late 1998 with serial number 5831-11 / 88-081.
|
|

269-19390 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

283-02390 viewsNelson Point, BHP wheel lathe sees BHP's big GE AC6000 unit 6073 'Fortescue' serial number 51065 on shed having wheel attention to the leading bogie. May 2002.
|
|

284-26390 viewsNarngulu, Geraldton, former Westrail P class loco P 2014 'Shire of Wongan-Ballidu' built by Goninan WA as a GE CM25-8 model with serial number 6320-12 / 90-099 sits in the yard in-between shunt movements. November 10, 2004.
|
|

250501 0434390 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3601 - GA 3602, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

225-18389 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6074 serial 51066 leading sister unit 6075 with another AC6000 unit mid-train. This was before the units were named. GeoData.
|
|

226-26389 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|

233-07389 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
150 |  |
 |
 |
 |
 |
 |
 |
|