Most viewed - Pilbara negative and digital Albums - Iron Ore |

227-07356 viewsNelson Point, view along the rear of A and B berths from Shiploader 2, salt pile on the left, then the under harbour tunnel portal, old reclaimers 3 and 4 with the crushing building in the distance, which has now been demolished, and the rear of Shiploader 1 on B berth. GeoData.
|
|

228-26356 viewsYandi Two balloon loop, the afternoon empty train arrives at the load-out tunnel behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
|
|

228-32356 viewsYandi Two exit portal or loaded car side of load-out tunnel, stacker tip just visible above stock pile, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is active at a time. Geodata -22.719050, 119.040566 .
|
|

233-18356 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

235-27356 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time, note the much larger style fuel tank fitted to the Comeng built M636 ALCo units and also the later marigold style BHP logo.
|
|

235-34356 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the unit has no marker lights and the tank tells it was an AE Goodwin built C636 ALCo before rebuild.
|
|

040806 102052356 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of the removed deck showing chutes.
|
|

050518 2134356 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 740, shows brake rigging plate for original owner, M&ST L.
|
|

050518 2190356 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 513, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050704 3992356 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
|
|

050407 0383356 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

050414 0939356 viewsFlash Butt yard, builders plate of Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper serial 153172. 14th April 2005.
|
|

050625 3817356 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, a Barclay Mowlem track lifter track machine off clear of the running lines. 25th June 2005.
|
|

050801 4773356 viewsIn the Flash Butt yard a line up of Barclay Mowlem track machines from the closest to the camera, tamper, regulator, regulator, tamper, clip installer, tamper then BHP's mainline tamper. 1st August 2005.
|
|

110411 09997356 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
|
|

150523 8220356 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0043, one of a second batch delivered in 2015 with safety slogan 'ASAP - As safe as possible'.
|
|

150523 8223356 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0037, one of a second batch delivered in 2015 with safety slogan 'Safety is a core value'.
|
|

160128 00332356 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0026, one of a batch of ten built in 2014.
|
|

080124 1632356 viewsChapman Siding, side view of slave waggon 1313, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

247-23356 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
149 |  |
 |
 |
 |
 |
 |
 |
|