Most viewed - Pilbara negative and digital Albums - Iron Ore |

0020 Comeng NSW 110411 10029398 viewsNelson Point, fuel tank waggon 0020 82 kL capacity, built by Comeng for BP as RTC 2, last of two such tanks, used on Mt Newman line, unsure when converted to 0020.
|
|

6202 Comeng WA 110619 1883398 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #13, 6202, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

0028 CNR - QRRS China 150314 7744398 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0028, one of a batch of ten built in 2014.
|
|

0031 CNR - QRRS China 160128 00339398 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
|
|

100330 8066398 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 30th March 2010.
|
|

141124 7092398 viewsRio Tinto compressor waggon set leader CB 01, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here at 7 Mile, Dampier on 24th November 2014.
|
|

171018 0735398 viewsRio Tinto compressor waggon set CB 15, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 18th October 2017.
|
|

241-28398 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.
|
|

243-20398 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

243-23398 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

02186 080304 2185398 viewsThomas Yard, down the rail welding end, side view of control waggon 2186, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

255-27398 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85 and sisters 9410, 9420 and 9414. Geodata location here. May 2002.
|
|

256-25398 viewsMaitland Siding, Robe River CM40-8M unit 9422 on an empty train. 9422 was built by Comeng NSW as an ALCo M636 model in August 1977 with serial C6103-2 and delivered to Robe River in November 1977. 22nd February 1979 9422 was lead unit on empty train involved in head on collision at Siding One, it was repaired at Cape Lambert and returned to service. It was eventually rebuilt by Goninan in March 1993 to become an CM40-8M with serial number 8297-03 / 93-138. May 2002.
|
|

268-03398 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

3307 Astra Vagoane 040804 155709398 viewsNelson Point, BHP ore waggon 3307 is one of three hundred and fifty waggons built during 1988 by Astra Vagoane of Arad in Romania for Lang Hancock as part of a 'waggons for iron ore arrangement' with the then Romanian government, however only seventy-five found their way into service with BHP. August 4, 2004.
|
|

9021 Comeng 030712 142242398 viewsNelson Point, empty BHP ore waggon 9021, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. July 12, 2003.
|
|

240701 2776398 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995.
|
|

221-33397 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.
|
|

222-27397 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie with 7091 has stopped for a crew change besides a loaded headed up by 7071.
|
|

225-24397 viewsAt the 24.1 km grade crossing on the BHP Newman line, General Electric AC6000 model unit 6073 serial 51065 built at GE Erie is the mid-train remote for the afternoon empty Yandi mine train as it heads south. This was before the units were named. GeoData.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
138 |  |
 |
 |
 |
 |
 |
 |
|