Most viewed - Pilbara negative and digital Albums - Iron Ore |

050518 2186365 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 519, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2193365 viewsBing Siding. Side view of 1963 built Magor USA waggon 516, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

051001 5692365 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #16, 6009, a Scotts of Ipswich Qld built flat waggon from September 1970.
|
|

050518 2206365 viewsBing Siding, a Gemco sleeper inserter track machine attached to a BHB type crane painted in BHP blue await another work day. 18th May 2005.
|
|

110411 09991365 viewsNelson Point, fuel tank waggon 0019 82 kL capacity, built by Comeng for BP as RTC 1, first of two such tanks, used on Mt Newman line, unsure when converted to 0019.
|
|

110411 10029365 viewsNelson Point, fuel tank waggon 0020 82 kL capacity, built by Comeng for BP as RTC 2, last of two such tanks, used on Mt Newman line, unsure when converted to 0020.
|
|

243-03365 viewsPort Hedland, Don Rhodes Mining Museum, preserved locomotives from the early days of the Port Hedland iron ore miners of Goldsworthy Mining and Mt Newman Mining. From left is Mt Newman Mining 5497, a Comeng NSW built M636 ALCo unit, Mt Newman Mining 5451 which was built by EMD as an F7A model and started life with Western Pacific in the USA and Goldsworthy Mining B class unit #2 built by English Electric serial number A-105. August 2003.
|
|

080304 2184365 viewsThomas Yard, down the rail welding end, side view of slave waggon 1185, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

247-34365 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
|
|

255-01365 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.
|
|

255-27365 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85 and sisters 9410, 9420 and 9414. Geodata location here. May 2002.
|
|

268-03365 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

110620 2040r365 viewsWalla Siding, empty BHP ore waggon 2899, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The steel panels in the ribs have been resheeted, but not the end panels. 20th of June 2011.
|
|

110620 2456r365 viewsWalla, loaded BHP ore waggon 2683, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The walls in the ribs have been resheeted. Still has the original white end for rotary coupler, original number and weight. 20th of June 2011.
|
|

220-32364 viewsGoldsworthy Junction, trailing shot of the afternoon departure for Yandi mine behind the standard double Dash 8 power consist, heading towards Bing Siding with the Flashbutt Yard visible in the distance.
|
|

224-33364 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|

225-22364 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
|
|

226-26364 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|

231-29364 viewsYandi Two balloon loop, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5652 on the left is the lead, while 5650 on the right is second unit. GeoData.
|
|

233-01364 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. GeoData.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
135 |  |
 |
 |
 |
 |
 |
 |
|