Most viewed - Pilbara negative and digital Albums - Iron Ore |

080304 2185368 viewsThomas Yard, down the rail welding end, side view of control waggon 2186, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 2205368 viewsThomas Yard, down the rail welding end, side view of slave waggon 1527, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

090121 1672368 viewsBoodarie, an FMG empty train departs the port with mismatched waggon pair slave 1403 22.6 tonnes tare and control 2364 22.9 tonne tare from the original CSR Zhuzhou Rolling Stock Works in China build from 2007.
|
|

249-21368 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking south following Cyclone John on 18th December 1999. Approximate location.
|
|

249-25368 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking upstream to the east from the middle of the bridge following Cyclone John on 18th December 1999. Approximate location.
|
|

254-15368 viewsFlash Butt yard, stored with no engine Goninan ALCo to GE rebuild C36-7M unit 5506 with serial number 4839-01 / 87-071. This was the first unit in the world to be built into a C36-7 from an ALCo C636 locomotive. It was rebuilt 1987 from AE-Goodwin built ALCo C636 numbered 5455 with serial number G6012-4.
|
|

255-20368 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
|
|

284-21368 viewsNarngulu, Geraldton, former Westrail P class loco P 2004 'Shire of Dalwallinu' built by Goninan WA as a GE CM25-8 model with serial number 6320-12 / 90-099 sits in the yard on empty mineral sand train waiting to run to Eneabba. November 9, 2004.
|
|

231-03367 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 'Yawata' serial 8412-07 / 93-141, note the difference in the liveries, 50 is in the teal and marigold logo and logo on the hood while 52 has the silver logo on the front only and no logo on the hood. GeoData.
|
|

231-35367 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

232-17367 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|

234-10367 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of left hand side radiator section. Circa 1998.
|
|

234-33367 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

040806 092738367 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a test waggon.
|
|

040814 092225367 viewsNelson Point, CFCLA ballast waggon CHQY type 740 just being delivered to BHP Iron Ore as part of the Rail PACE project, handbrake end view.
|
|

050410 0542367 viewsNelson Point, tanker filling area, fuel tank waggon 0015, a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
|
|

050412 0769367 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 524, originally in ore service before conversion to a ballast waggon.
|
|

050518 2117367 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view of hydraulics and pneumatics.
|
|

050518 2155367 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 537, originally in ore service before conversion to a ballast waggon.
|
|

050801 4768367 viewsFlash Butt yard, rail recovery and transport train, builders plate of 3rd lead off waggon 6205, built by Comeng WA, January 1977 under order no. 07-M-282 RY.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
131 |  |
 |
 |
 |
 |
 |
 |
|