Most viewed - Pilbara negative and digital Albums - Iron Ore |

0206 USA 050518 2120402 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, 3/4 view from handbrake end.
|
|

0504 Magor USA 050518 2195402 viewsBing Siding. Side view of 1963 built Magor USA waggon 504, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0536 Magor USA 050518 2198402 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
|
|

0016 Comeng WA 050704 3994402 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons, detail of A end and bogie.
|
|

6209 Comeng WA 051001 5688402 viewsBoodarie, the Steel Train or rail recovery and transport train, builders plate detail of flat waggon #12, 6209, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

6201 Comeng WA 051001 5732402 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
|
|

6011 Scotts of Ipswich Qld 051001 5738402 viewsBoodarie, the Steel Train or rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

6014 Comeng WA 050522 2735402 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #25, 6014, built by Comeng WA in November 1971.
|
|

060429 3730402 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining, builders plate for Scotts of Ipswich Qld with a 24th September 1970 build date, one of nine originally numbered 6005-6013.
|
|

0594 BHP OCRS 060713 6549402 viewsBoodarie Yard, modified original Magor USA built Oroville waggon 594, cut down and covered and in use as indexing waggons on the front of each rake for Finucane Island car dumpers, note the original ODCX marking visible.
|
|

050801 4758402 viewsIn the Flash Butt yard a line up of Barclay Mowlem track machines from the closest to the camera, tamper, regulator, regulator, tamper, clip installer, tamper then BHP's mainline tamper. 1st August 2005.
|
|

051001 5673402 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks view of the light buggy and rods. 1st October 2005.
|
|

051001 5678402 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks view of the shipping decal. 1st October 2005.
|
|

6203 Comeng WA 080621 2723402 viewsTabba South, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
|
|

6214 Gemco 080621 2729402 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, detail of A end.
|
|

0003 Comeng NSW 110411 09994402 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
|
|

0014 Comeng WA 110411 10001402 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
|
|

110602 8646402 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco. Note these waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
|
|

171121 0963402 viewsBarker Siding, Loram rail grinder MPC 2, grinder cart. 21st November 2017.
|
|

243-04402 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
131 |  |
 |
 |
 |
 |
 |
 |
|