Most viewed - Pilbara negative and digital Albums - Iron Ore |

080304 2172370 viewsThomas Yard, down the rail welding end, side view of control waggon 2242, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

250-17370 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 1550 hrs 21st October 2000.
|
|

221-26369 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
|
|

221-33369 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.
|
|

229-31369 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister unit 5642 drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan, to the left in the distance is a partial glimpse of the Three Sisters. GeoData.
|
|

235-00369 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train with second unit Goninan built CM39-8 unit 5630 'Zeus', notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new. The loadout operator is walking past the train.
|
|

235-11369 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
|
|

050319 0144369 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

050518 2099369 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 748.
|
|

050518 2110369 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 750.
|
|

050518 2194369 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 504, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2195369 viewsBing Siding. Side view of 1963 built Magor USA waggon 504, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050704 3988369 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
|
|

051001 5691369 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #15, 6206, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

051001 5716369 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #24, 6005, builders plate, a Scotts of Ipswich Qld built flat waggon on 12th September 1970.
|
|

060429 3740369 viewsFlash Butt yard, Pony re-laying waggon 6704 flat waggon, unsure of history or who built it or where it came from, it looks to be heavy duty with riveted side frames and an odd handbrake arrangement.
|
|

060501 3895369 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8703 side dump waggon loaded with ballast.
|
|

060618 6217369 viewsFlash Butt yard, modified original Magor USA built Oroville waggon 567, cut down and covered for use as indexing waggons at Finucane Island car dumpers, note the original ODCX marking visible.
|
|

050625 3815369 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, two Barclay Mowlem sleeper inserter track machines off clear of the running lines. 25th June 2005.
|
|

051001 5678369 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks view of the shipping decal. 1st October 2005.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
128 |  |
 |
 |
 |
 |
 |
 |
|