Most viewed - Pilbara negative and digital Albums - Iron Ore |

050412 0779406 viewsHesta Siding south, BHP's EX 01 high rail excavator, built in France by Geismar as a KGT 4RS model with serial 4559. 12th April 2005.
|
|

050421 1615406 viewsHesta Siding backtrack, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this unit was later stickered as RG 2, side view of the second grinding module. 21st April 2005.
|
|

050625 3633406 viewsMooka North backtrack holds BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480 as a ballast train runs past on the passing track as an empty ore train is on the mainline. 25th June 2005.
|
|

060326 3214406 viewsBing Siding, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480 runs towards Nelson Point on the mainline with the new western mainline in the foreground and Bing passing track on the right. 26th March 2006.
|
|

060429 3768406 viewsFlash Butt yard, an unidentified ballast regulator. 29th April 2006.
|
|

060501 3915406 viewsAbydos Siding backtrack, Speno rail grinder RG 2, third grinding module and driving cab. 1st May 2006.
|
|

6104 Mt Newman Mining Workshops 080621 2716406 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6104 in service with the rail recovery and transport train as waggon #6.
|
|

6203 Comeng WA 081217 0457406 viewsWoodstock Siding, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977 under order number 07-M-282 RY. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
|
|

6206 Comeng WA 110619 1885406 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #15, 6206, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

CHTY 715 130720 1438406 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 715, modified from a similar CHQY class with the end framing removed attached to an SD40R unit 3091.
|
|

6702 Mt Newman Mining Workshops 130720 1558406 viewsFlash Butt yard, rail recovery and transport train, flat waggon 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
|
|

CHQY 732 130720 1562406 viewsFlash Butt yard, CFCLA ballast waggon CHQY class CHQY 732, former US-Canadian CRDX class.
|
|

170510 8293406 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

243-18406 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

02242 080304 2172406 viewsThomas Yard, down the rail welding end, side view of control waggon 2242, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

248-23406 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9427 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in January 1987. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Approximate location. 24th April 2004.
|
|

267-07406 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with mid-train units CM40-8M units 5651 and 5645 104 waggons back with 104 waggons trailing. 1247 hrs 12th of April 2002.
|
|

220-23405 viewsGoldsworthy Junction, a loaded train from Yarrie mine lead by BHP Dash 7 unit 5507 'Nimingarra' serial 4839-03 / 87-072 was rebuilt by Goninan WA from an ALCo C636 unit 5461 into GE model C36-7M in 1987.
|
|

221-27405 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
|
|

227-18405 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
124 |  |
 |
 |
 |
 |
 |
 |
|