Most viewed - Pilbara negative and digital Albums - Iron Ore |

060429 3733372 viewsFlash Butt yard, Pony waggon 6017, built by Comeng WA in 1971 in a batch of three numbered 6014-6017, view of asset number 6506-017.
|
|

050414 0951372 viewsFlash Butt yard, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this front unit was later stickered as RG 2, rear view of the driving cab and generator module with the first grinding module. 14th April 2005.
|
|

050518 2211372 viewsBing Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the passing track. 18th May 2005.
|
|

060501 3925372 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, generating set and second driving cab module, cab side view. 1st May 2006.
|
|

100717 0668372 viewsFlash Butt yard, new rail stock carrier waggon 6026, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

110208 9434372 viewsFlash Butt yard, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the height adjustable lead roller guide is upright, squeeze rollers behind the mesh.
|
|

110411 10018372 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
|
|

110411 10019372 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
|
|

130720 1556372 viewsFlash Butt yard, new heavyweight out of gauge flat waggon 6000, unsure of builder, could be Gemco Rail in Perth.
|
|

150619 9082372 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, mid-section detail.
|
|

170728 09906372 viewsWestern Creek, the disabled Mesa A train gets underway with relief power from General Electric built ES44DCi unit 8137 serial 59140 and Dash 9-44CW unit 7082 as the operate the train with the two ES44ACi units isolated. 28th July 2017. GeoData.
|
|

243-12372 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

080124 1621372 viewsChapman Siding, view looking north of a rake of new CSR Zhuzhou Rolling Stock Works China built waggons stabled in the passing track to free up yard room. 24th January 2008.
|
|

080124 1623372 viewsClose up view of the F type Interlock coupler and knuckle. 24th January 2008.
|
|

247-13372 viewsCape Lambert overview of the fuel point, with a brace of four CM40-8M rebuilds finishing up refuelling before departing with another empty train. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|

247-31372 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Location is here.22nd May 2002.
|
|

249-18372 viewsTable Hill on the Robe River railway line, a microwave radio communications site powered by solar panels. Approximate location.
|
|

249-20372 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking south following Cyclone John on 18th December 1999. Approximate location.
|
|

251-16372 viewsNelson Point, the South Yard 'prep shed' located on the dumper exit roads 102, 103 and, 104. Goninan GE rebuild unit 5656 a CM40-8M unit with serial number 8412-01 / 94-147 sits on shed with a sister units. This facility was used to service and fuel locomotives while their respective waggon rakes were being tipped through the car dumpers. 22nd April 2000.
|
|

210322 9583372 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
123 |  |
 |
 |
 |
 |
 |
 |
|