Most viewed - Pilbara negative and digital Albums - Iron Ore |

130720 1562374 viewsFlash Butt yard, CFCLA ballast waggon CHQY class CHQY 732, former US-Canadian CRDX class.
|
|

150619 9079374 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting, B end and bogie detail.
|
|

150620 9328374 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggon 0209 waits to be loaded.
|
|

150729 9455374 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
|
|

100330 8067374 viewsRio Tinto compressor waggon set CB 05, receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 30th March 2010.
|
|

241-35374 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.
|
|

243-04374 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
|
|

243-16374 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

080124 1625374 viewsChapman Siding, new FMG ore waggon pair 1255 slave and 2256 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

246-02374 viewsCape Lambert, view of the then new extension to the south for the West Angelas mine was coming on stream, the siding furthest from the camera will become a compressor waggon holding road while the original line or Mainline is the second from the camera, with the car dumper one Empty Car line closest, and what becomes the car dumper two Loaded Car line is third. 22nd May 2002.
|
|

255-35374 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the left joining the HI Tom Price line. Train Control board for crews to change channels. May 2002.
|
|

283-19374 viewsHarding Siding, quad Robe River CM40-8M units 9414, 9420, 9410 and 9425 lead 202 loaded ore waggons at Siding 1 (Harding). The siding has recently been renamed Harding and extended at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
|
|

030712 142552374 viewsNelson Point, empty BHP ore waggon 553, one of the original Magor USA build waggons bought out at construction of the Mt Newman project. Visible is the ODCX code and number 82190 from the Oroville Dam Construction company days in the USA. Unsure of the MS6-82 code, the DZ 11-95 code was the late time it was internally painted to reduce wear and the SL 76 with 92 below it was the last time the Miner SL-76 draft gear was replaced. The orange smiley sticker indicates that this is an original 'Oroville Dam' ore waggon and non relayed AB braked. 12th of July 2003.
|
|

220-26373 viewsGoldsworthy Junction, an empty train on the Newman line approaches having departed Nelson Point. The line merging in from the right is the Goldsworthy line to Yarrie and Nimingarra, which can then be made out diverging to the left just after the interlocking room in front of the train.
|
|

222-27373 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie with 7091 has stopped for a crew change besides a loaded headed up by 7071.
|
|

225-26373 views24.1 km grade crossing on the Newman line, empty train racing off into the distance. GeoData.
|
|

227-05373 viewsNelson Point, view along B berth with Shiploader 1, this loader has since been replaced. In the distance now are berths E and F, Redbank Powerstation can be seen in the distance. GeoData.
|
|

227-18373 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
|
|

227-26373 views30 km looking south, empty ore train with mostly Comeng built ore waggons. GeoData.
|
|

229-07373 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, note the sheet metal windscreen protector plates, grade crossing is the YT 311.5 km. GeoData.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
119 |  |
 |
 |
 |
 |
 |
 |
|