Most viewed - Pilbara negative and digital Albums - Iron Ore |

080304 2182376 viewsThomas Yard, down the rail welding end, side view of slave waggon 1337, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 2203376 viewsThomas Yard, down the rail welding end, side view of slave waggon 1515, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

246-28376 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. In the distance can be seen are the railway workshops. 22nd May 2002.
|
|

249-34376 viewsLoaded Hamersley Iron ore waggon pair Tomlinson Steel WA built 5708 and Nippon Sharyo Japan built 906. Approximate location. 18th December 1999.
|
|

250-16376 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 1550 hrs 21st October 2000.
|
|

251-35376 viewsWalla Siding, two examples of BHP's ore waggon fleet of Comeng built waggons. The waggon closet to the camera has a new coupler fitted.
|
|

210322 9584376 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake, view of B end. Location is roughly here. 22nd March 2021.
|
|

257-08376 viewsFlash Butt yard Mount Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW awaits its fate. Late 2021.
|
|

222-23375 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie brings an empty train to a stop with 7091 for a crew change besides a loaded headed up by 7071.
|
|

229-08375 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151, cab side. GeoData.
|
|

232-04375 viewsYandi Two, view west from near the 311.6 km grade crossing, train can be seen loading on the right. February 1997. GeoData.
|
|

235-02375 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train with second unit Goninan built CM39-8 unit 5630 'Zeus', notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
|
|

040806 092042375 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

040810 144947375 viewsShaw Siding backtrack, Difco Ohio USA 1967 build short side dump waggon 8701, originally built for Goldsworthy Mining as no. 1, renumbered by Mt Newman as 8701, one five waggons built for Goldsworthy Mining.
|
|

050421 1383375 viewsQuarry 8, Shaw Siding area, Dash 8 unit 5636 shunts the loaded ballast rake under the water point on the south leg of the triangle. Original Magor USA built ballast cars 516 and 504 dating from a 1963 build.
|
|

050518 2106375 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 752.
|
|

050518 2121375 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of handbrake end.
|
|

051001 5624375 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, pushed into an earth bund with 55 tonne flat waggon 6705 behind, view from handbrake end.
|
|

050724 4307375 viewsBing Siding, empty fuel tank waggon 0018, a Comeng WA built 116 kilolitre tank waggon, one of a batch of six built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
|
|

060429 3738375 viewsFlash Butt yard, Pony re-laying waggon, #1, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
116 |  |
 |
 |
 |
 |
 |
 |
|