Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
050518_2191.jpg
050518 2191377 viewsBing Siding. Side view of 1963 built Magor USA waggon 513, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050801_4766.jpg
050801 4766377 viewsFlash Butt yard, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich Qld on 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
051001_5686.jpg
051001 5686377 viewsBoodarie, the Steel Train or rail recovery and transport train, hand brake end of waggon #12, 6209, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
051001_5695.jpg
051001 5695377 viewsBoodarie, the Steel Train or rail recovery and transport train, builders plate detail of flat waggon #16, 6009, a Scotts of Ipswich Qld built flat waggon from September 1970.
051001_5737.jpg
051001 5737377 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
050525_2991.jpg
050525 2991377 viewsMooka Siding, rail recovery and transport train flat waggon #23, 6208, built by Comeng WA in February 1977 under order number 07-M-282 RY.
050724_4312.jpg
050724 4312377 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
060429_3723.jpg
060429 3723377 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
060429_3731.jpg
060429 3731377 viewsFlash Butt yard, Pony waggon 6017, built by Comeng WA in 1971 in a batch of three numbered 6014-6017, with asset number 6506-017, view of builders plate.
110208_9441.jpg
110208 9441377 viewsFlash Butt yard, new rail stock carrier waggon 6033 loaded with strings of rail, built by Gemco Rail in late 2009-10 with Barber bogies.
110411_09979.jpg
110411 09979377 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
130720_1563.jpg
130720 1563377 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 717, modified from a similar CHQY class with the end framing removed.
170510_8283.jpg
170510 8283377 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
170728_09689.jpg
170728 09689377 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
080124_1624.jpg
080124 1624377 viewsChapman Siding, side view of control waggon 2256, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
080304_2183.jpg
080304 2183377 viewsThomas Yard, down the rail welding end, side view of control waggon 2338, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
110620_2275.jpg
110620 2275377 viewsChapman, FMG TK type fuel tank waggon TK 06 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
246-11.jpg
246-11377 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
246-32.jpg
246-32377 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 136 which is from the original order for 285 waggons from Nippon Sharyo Japan. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
243-37.jpg
243-37377 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
6096 files on 305 page(s) 113

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional