Most viewed - Pilbara negative and digital Albums - Iron Ore |

110411 10027378 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
|
|

110619 1881378 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #11, 6210, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

150314 7743378 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
|
|

160128 00336378 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0034, one of a second batch delivered in 2015 with safety slogan 'Think Safe + Work Safe = Go Home Safe'.
|
|

160128 00342378 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0032, one of a second batch delivered in 2015 with safety slogan 'Start with safety'.
|
|

110602 8647378 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
|
|

248-23378 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9427 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in January 1987. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Approximate location. 24th April 2004.
|
|

257-18378 viewsFlash Butt yard Mount Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW awaits its fate. Late 2021.
|
|

268-08378 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

268-31378 viewsAt the 39 km detection site with the Alstom 25-year special, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
|
|

283-20378 viewsHarding Siding, quad Robe River CM40-8M units 9414, 9420, 9410 and 9425 lead 202 loaded ore waggons at Siding 1 (Harding). The siding has recently been renamed Harding and extended at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
|
|

030712 143315378 viewsNelson Point, empty BHP ore waggon 9026 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.
|
|

224-28377 viewsBing siding, mid-train remote units Goninan rebuild CM40-8M GE units 5638 'Mallina' serial 8281-02 / 92-127 leads sister unit 5669. GeoData.
|
|

228-19377 viewsYandi Two branch, the afternoon empty train crosses the bridge at the YT307 km behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.706976, 119.097651 .
|
|

228-29377 viewsYandi Two load-out tunnel, view of empty train about to enter for loading behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
|
|

229-22377 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|

230-23377 viewsYandi Two balloon loop, cab side view of Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 with ALCo Hi-Ad bogie. Geodata -22.718338, 119.039909 .
|
|

234-14377 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of right hand side engine hood and fuel tank. Circa 1998.
|
|

235-14377 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 passes out the other side of the loadout tunnel as loading has commenced, the dust extraction equipment and retaining wall culvert frame the loco.
|
|

050518 2191377 viewsBing Siding. Side view of 1963 built Magor USA waggon 513, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
112 |  |
 |
 |
 |
 |
 |
 |
|