Most viewed - Pilbara negative and digital Albums - Iron Ore |

050518 2211416 viewsBing Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the passing track. 18th May 2005.
|
|

050801 4722416 viewsNelson Point yard, ballast regulator BR 33 a Plasser Australia model SSP 302 unit serial M486. 1st August 2005.
|
|

060501 3910416 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
|
|

6033 Gemco WA 110208 9441416 viewsFlash Butt yard, new rail stock carrier waggon 6033 loaded with strings of rail, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

CHTY 717 130720 1563416 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 717, modified from a similar CHQY class with the end framing removed.
|
|

0041 CNR - QRRS China 160128 00337416 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0041, one of a second batch delivered in 2015 with safety slogan 'Stay alert don't get hurt'.
|
|

0040 CNR - QRRS China 160128 00338416 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0040, one of a second batch delivered in 2015 with safety slogan 'Think Safe - Act Safe'.
|
|

170728 09906416 viewsWestern Creek, the disabled Mesa A train gets underway with relief power from General Electric built ES44DCi unit 8137 serial 59140 and Dash 9-44CW unit 7082 as the operate the train with the two ES44ACi units isolated. 28th July 2017. GeoData.
|
|

170510 8294416 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

243-05416 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
|
|

247-15416 viewsCape Lambert overview of the fuel point, with a brace of four CM40-8M rebuilds finishing up refuelling before departing with another empty train. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|

257-17416 viewsFlash Butt yard, view of Rail Dynamics Laboratory test waggon 2703 - Test Car R2, modified by BHP from waggon number 2716 in 1975, originally a Comeng built waggon dating from 1971. Late 2001.
|
|

267-33416 viewsAt the 39 km, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands with the Sundowner Special alongside the AEI reader at the 39 km detector site on the Newman mainline. This was a special for the 25 years of the Alstom / BHP service agreement. Friday 12th of April 2002.
|
|

283-13416 viewsHarding Siding on the Robe River line at the 42 kilometre post looking in the down direction towards Deepdale. Recently extended north end of the siding to accommodate the soon to be West Angelas traffic and longer trains. 22nd of May 2002.
|
|

221-31415 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.
|
|

228-20415 viewsYandi Two branch, the afternoon empty train crosses the bridge at the YT307 km behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.706976, 119.097651 .
|
|

232-24415 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
|
|

232-30415 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
|
|

238-23415 viewsNelson Point loco overhaul shop, former Union Pacific loco 3523 an EMD SD40-2 model, serial 786170-25 and now numbered 3085 for BHP Billiton Iron One service had only been in operation for eleven days when this shot was taken on the 27th November 2004. Geodata .
|
|

0510 Mt Newman Mining Workshops 040806 092738415 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a weighbridge test waggon. The others in the fleet are 40, 60 and 100 tons.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
108 |  |
 |
 |
 |
 |
 |
 |
|