Most viewed - Pilbara negative and digital Albums - Iron Ore |

150314 7745381 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
|
|

150314 7746381 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0025, one of a batch of ten built in 2014.
|
|

170730 0492381 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 with 112 waggons, a mid-train unit and another 112 waggons. 30th July 2017. GeoData.
|
|

170728 09690381 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

241-19381 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Three quarter rear view. June 2002.
|
|

241-20381 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Drivers side view of the radiator section. June 2002.
|
|

241-37381 viewsNelson Point, Car Dumper 2 holding roads, two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.
|
|

243-20381 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

080304 2171381 viewsThomas Yard, down the rail welding end, side view of slave waggon 1241, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

247-35381 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
|
|

249-01381 viewsYule River road crossing on the former Hedland - Wittenoom Road in flood after Tropical Cyclone John in December 1999. Approximate location.
|
|

267-20381 viewsGoldsworthy Junction, CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 leads the Sundowner Special on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in the middle and sister CM40-8M 5653 bringing up the rear.
This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 are holding track.
They can be seen behind the signal sitting on the transfer road.
Friday 12th of April 2002.
|
|

267-33381 viewsAt the 39 km, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands with the Sundowner Special alongside the AEI reader at the 39 km detector site on the Newman mainline. This was a special for the 25 years of the Alstom / BHP service agreement. Friday 12th of April 2002.
|
|

283-13381 viewsHarding Siding on the Robe River line at the 42 kilometre post looking in the down direction towards Deepdale. Recently extended north end of the siding to accommodate the soon to be West Angelas traffic and longer trains. 22nd of May 2002.
|
|

221-27380 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
|
|

225-07380 viewsBing siding, the afternoon departure for Yandi mine heads south past the ballast consist, behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
|
|

226-13380 viewsShaw North, 216.5 km, arrival signal SWN 3 Shaw North 3 at the top of the steep 1.5 percent climb that south bound empties face. Dragging equipment detection bars visible, they are painted yellow and the interlocking room. GeoData.
|
|

227-30380 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
|
|

229-27380 viewsYandi Two loadout exit side, Goninan rebuild CM40-8M GE units 5650 'Yawata' serial 8412-07 / 93-141 and sister unit 5642 drag a loading train at 1.2 km/h, both units carry the BHP Iron Ore teal and marigold livery for the logo. GeoData.
|
|

231-24380 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 as the outgoing crew arrive to change out. GeoData.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
107 |  |
 |
 |
 |
 |
 |
 |
|