Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
060723_7685.jpg
060723 7685383 viewsOriginal Hamersley Iron compressor waggon set IC-6 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. Seen here on the causeway just outside 7 Mile. 23rd July 2006.
171121_0971.jpg
171121 0971383 viewsBarker Siding, Loram rail grinder MPC 2, this was sent out from the USA where it was operational as LMIX 602 for Loram. The generator and driving cab look to be fitted to an 85 foot piggy back waggon. 21st November 2017.
241-34.jpg
241-34383 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist. June 2002.
246-26.jpg
246-26383 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab. 22nd May 2002.
247-16.jpg
247-16383 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper. 22nd May 2002.
248-09.jpg
248-09383 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings. The signal marker boards are in the distance. Approximate location. 24th April 2004.
249-23.jpg
249-23383 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking downstream to the west following Cyclone John on 18th December 1999. Approximate location.
249-28.jpg
249-28383 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
251-05.jpg
251-05383 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5513 awaits its fate. Rebuilt in 1988 at Goninan's Welshpool factory from 1970 AE Goodwin built ALCo C636 with serial number G6012-2 and road number 5453 and assigned new serial number 4839-02 / 88-078. It was delivered in Mt Newman Mining orange and was named Kalgan. 22nd April 2000.
252-12.jpg
252-12383 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 01 is behind the locomotive. Location is roughly here. 24th November 2001.
255-26.jpg
255-26383 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85 and sisters 9410, 9420 and 9414. Geodata location here. May 2002.
268-24.jpg
268-24383 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
225-15.jpg
225-15382 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with another AC6000 unit mid-train. GeoData.
226-07.jpg
226-07382 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with Goninan rebuild CM40-8M GE unit 5653 'Chiba' serial 8412-10/93-144 leading sister unit 5643 down the grade. GeoData.
228-03.jpg
228-03382 viewsWords fail this picture!
228-20.jpg
228-20382 viewsYandi Two branch, the afternoon empty train crosses the bridge at the YT307 km behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.706976, 119.097651 .
228-28.jpg
228-28382 viewsYandi Two load-out tunnel, view of empty train about to enter for loading behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
229-02.jpg
229-02382 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
229-15.jpg
229-15382 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
229-20.jpg
229-20382 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
6096 files on 305 page(s) 103

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional