Most viewed - Pilbara negative and digital Albums - Iron Ore |

236-17383 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
|
|

238-23383 viewsNelson Point loco overhaul shop, former Union Pacific loco 3523 an EMD SD40-2 model, serial 786170-25 and now numbered 3085 for BHP Billiton Iron One service had only been in operation for eleven days when this shot was taken on the 27th November 2004. Geodata .
|
|

040806 091046383 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

050518 2187383 viewsBing Siding. Side view of 1963 built Magor USA waggon 519, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2189383 viewsBing Siding. Side view of 1963 built Magor USA waggon 508, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050704 3979383 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
|
|

051001 5627383 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of handbrake end, pushed into earth bund.
|
|

051001 5723383 viewsBoodarie, the Steel Train or rail recovery and transport train flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
|
|

050315 0237383 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0012 and 0016 and others in the BHP blue and white livery.
|
|

050522 2732383 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #22, 6213, built by Comeng WA in February 1977 under order number 07-M-282 RY.
|
|

050522 2739383 viewsGoldsworthy Junction, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich Qld in September 1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

050724 4214383 viewsNelson Point yard, flat waggon #6? in service on the Pony re-laying train as a transport waggon for a gantry car as pictured. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
|
|

060429 3720383 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
|
|

050412 0821383 viewsAbydos Siding backtrack, builders plate of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050414 0937383 viewsFlash Butt yard, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper serial 153172. 14th April 2005.
|
|

060326 3208383 viewsBing Siding, south arrival BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480 takes the mainline with the new western mainline in the foreground. 26th March 2006.
|
|

060403 3268383 viewsTabba North backtrack, BHP clip driving machine, shows the foot pedals the operators use and basket loaded with rail insulators, modified from a former Plasser Australia USP 3000 ballast regulator. 3rd April 2006.
|
|

110619 1885383 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #15, 6206, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

170729 0288383 viewsMaitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 have crossed the 96.2 km grade crossing. 29th July 2017. GeoData.
|
|

170730 0435383 viewsBoodarie, a loaded FMG iron ore train rounds the large curve at the 5 km as it approaches the car dumper balloon loops behind Progress Rail Muncie USA built SD70ACe/LCi unit 719 serial 20118693-011 and sister 704 with the first four waggons showing panel repairs and re-lining recently undertaken. 30th July 2017. GeoData.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
102 |  |
 |
 |
 |
 |
 |
 |
|