Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
1025_060722_7439.jpg
1025 060722 7439149 viewsRobe River ore waggon 1025, built by Bradken Rail Qld in January 2006, handbrake side empty view at the 45.4 km just south of Harding Siding on the Cape Lambert line. July 22, 2006.
1110_170729_0261.jpg
1110 170729 0261149 viewsRobe River ore waggon 1110, built by Bradken Rail Qld in April 2012, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
1111_160727_0954.jpg
1111 160727 0954149 viewsRobe River ore waggon 1111, built by Bradken Rail Qld in May 2012, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
0332_180616_1647.jpg
0332 180616 1647149 viewsRobe River ore waggon 332, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side loaded view at the 38.5 km, Harding on the Cape Lambert line, June 16, 2018.
0453_180616_1703.jpg
0453 180616 1703149 viewsRobe River ore waggon 453, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0539_180616_1713.jpg
0539 180616 1713149 viewsRobe River ore waggon 539, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0652_180616_1857.jpg
0652 180616 1857149 viewsRobe River ore waggon 652, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at Maitland Siding on the Deepdale line, June 16, 2018.
0666_180616_1700.jpg
0666 180616 1700149 viewsRobe River ore waggon 666, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0817_180616_1676.jpg
0817 180616 1676149 viewsRobe River ore waggon 817, built by Centurion Industries WA, rotary coupler end non-handbrake side loaded view with the pulled fixed coupler from 425 at the 33.7 km, Arches on the Cape Lambert line, June 16, 2018.
0937_210322_9771.jpg
0937 210322 9771149 viewsRobe River ore waggon 937, built by Centurion Industries WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
240619_0333r.jpg
240619 0333r149 viewsCape Lambert yard, Hamersley Iron's GE built 9-44CW locomotive 7069 with serial number 47748, delivered in 1995 from the original locomotive order and still looking in pretty good condition despite its age. Captured on June 19, 2024.
240619_0410.jpg
240619 0410149 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31651 is a master and is bar coupled to slave waggon 36651 built by China Northen as a Q type in 11/2022. Captured on June 19, 2024.
240619_0427.jpg
240619 0427149 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31478 is a master and is bar coupled to slave waggon 36478 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
240701_2419.jpg
240701 2419149 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31598 is a master and is bar coupled to slave waggon 36598 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2437.jpg
240701 2437149 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31637 is a master and is bar coupled to slave waggon 36637 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
070608_0152.jpg
070608 0152148 viewsMidland, Pacific National RZDY type crew accommodation car RZDY 100 'MOPOKE', started life as a Bluebird railcar driving trailer built by South Australian Railways Islington Workshops in 1955 as Mopoke. In 1986 coded 100, then to 107, in 2001 renumbered 100 and named 'Cabernet'. Converted to crew car for Pacific National as RZDY in 2006 at Islington workshops.
100605_9070.jpg
100605 9070148 viewsMidland, Pacific National crew accommodation coach BRS 222, built by Victorian Railways Newport Workshops in 1952 as AS 16 First class, to BRS 2, then BS 222. Leased and then sold to West Coast Rail in 1995, and then sold to Pacific National in 2004.
0033_110602_1738.jpg
0033 110602 1738148 viewsRobe River ore waggon 033, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0298_170729_0248.jpg
0298 170729 0248148 viewsRobe River ore waggon 298, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0445_170729_0199.jpg
0445 170729 0199148 viewsRobe River ore waggon 445, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
19218 files on 961 page(s) 946

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional