Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
217-17.jpg
217-17555 viewsDry Creek Motive Power Centre, side view of Australian National BL class leader BL 26 'Bob Hawke' Clyde Engineering EMD model JT26C-2SS serial 83-1010
219-02.jpg
219-02555 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7089 serial 47768 and 7090 wait their next loaded train to push out, the tail of which is visible on the left with the mine stockpile in the background.
030405_140236.jpg
030405 140236555 viewsKyancutta, track view of timber and steel sleepers with bolted rail joins, and a 10 km/h speed restriction, 5th April 2003.
030407_082237.jpg
030407 082237555 viewsWudinna, empty grain train behind a trio of former Australian National locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial 83730, rebuilt by Port Augusta Workshops to DA class, DA 4 leading two AE Goodwin ALCo model DL531 830 class units 842, serial 84140 and 851 serial 84137, 851 having been on the Eyre Peninsula since delivered in 1962, to shunt off empty waggons into the grain siding. 7th April 2003.
150505_7959.jpg
150505 7959555 viewsFMG Solomon Line, a pair of General Electric Dash 9-44CW locomotives 005 serial 58182 and 006 serial 58183 struggle upgrade with a loaded train at the 227 km bound for Port Hedland, the train is being assisted in the rear. Geodata: -22.0189283 118.5861050 .
160522_2096.jpg
160522 2096555 viewsParkeston, 6MP4 intermodal train, platform 5 of 5-pack RRRY 7007 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, Harris Refrigerated Logistics HARR 466001 reefer and Toll TCML 48583 48' container.
160522_2219.jpg
160522 2219555 viewsParkeston, SCT train 6MP9 operating from Melbourne to Perth departs for West Kalgoorlie and eventually Perth behind EDI Downer built EMD model GT46C-ACe unit SCT 007 'Geoff (James Bond) Smith' serial 97-1731 with 76 waggons for 5382 tonnes and 1800 metres length.
181118_0308r.jpg
181118 0308r555 viewsRedbank, flat waggon 8500, originally built by Tomlinson Steel WA for Goldsworthy Mining as one of six 55 ton flat waggons built in 1966, and later modified by BHP to increase its capacity.
171-18.jpg
171-18554 viewsBallarat station, V/Line broad gauge N class N 457 'City of Mildura' Clyde Engineering EMD model JT22HC-2 serial 85-1225, sitting at platform with an Up passenger train.
128-22.jpg
128-22554 viewsSunbury, V/Line broad gauge N class N 461 'City of Ararat' Clyde Engineering EMD model JT22HC-2 serial 86-1190, down passenger train, wife talking to driver.
108-06.jpg
108-06554 viewsMurchison East Ascom Jumbo silo complex, around the curve north of the station, shows the grain loading siding, No.2 Rd and the main on the right.
135-10.jpg
135-10554 viewsIpswich signal box, rear, semaphore signal.
188-06.jpg
188-06554 viewsHenty, located 580 km from Sydney on the NSW Main South, looking south, station platform and buildings, two V/Line grain waggons in the yard. Goods shed and platform on the right. Geo Data.
189-02.jpg
189-02554 viewsUranquinty, located at the 535.72 km on the NSW Main South line, view looking south, view of the interlocking for ground frame B for the goods and grain sidings, the original and newer weighbridge buildings can be seen above the levers.
189-19.jpg
189-19554 viewsYerong Creek, located at the 565.08 km on the NSW Main South line, view looking south along the Loop with Mainline at left and Goods Siding coming in from the right.
192-14.jpg
192-14554 viewsJunee, NSWSRA standard gauge locomotive depot, a view looking through the fuelling point with the sanding facility behind that, stored 45 class units on the right.
198-17.jpg
198-17554 viewsPort Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant.
206-31.jpg
206-31554 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.
209-02.jpg
209-02554 viewsEast Perth Passenger Terminal, Westrail L class L 272 Clyde Engineering EMD model GT26C serial 69-621 shunts flat waggons around the Indian Pacific consist.
209-11.jpg
209-11554 viewsAshfield, looking towards Perth from the station overbridge, the dual gauge tracks and yard running between the mainline and Railway Parade on the right. The standard gauge and narrow gauge points are easy to spot.
19088 files on 955 page(s) 90

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional